The Federal Bureau of Prisons, Field Acquisition Office, is seeking a contractor to replace the existing Education chair lift at FCI Oxford with a new ADA-compliant inclined platform lift. The work includes disconnecting and protecting existing electrical service, removing the current lift assembly, and furnishing and installing a new lift system. The contractor must comply with ASME A18.1, ADA-ABA requirements, NFPA, NEC, and all applicable Federal, State, and local codes. The performance period for the project will be 140 calendar days from the issuance of the notice to proceed.
Some key aspects of the job include:
• The new lift system will include a complete platform assembly, drive and guide-rail components, obstruction-sensing devices, passenger restraining arms, retractable boarding ramps, kick plates, safety lighting, hand grips, low-voltage controls, emergency stop features, and keyless operation.
• The contractor will also provide a new drive cabinet, integrated disconnect, battery backup system, call stations at each landing, and all associated programming, testing, and adjustments.
• Installation shall be performed by manufacturer-certified technicians, and the contractor shall provide all required submittals, safety plans, quality control documentation, testing, and closeout materials.