The Brooklyn Bridge Park (BBP) is soliciting proposals for a retrofit of the Pier 1 lighting system. The scope includes removal of existing metal‑halide flood and pedestrian fixtures, supply and installation of new LED flood and pedestrian luminaires, integration with an existing Lutron‑based lighting‑control system, testing, commissioning, and provision of as‑built documentation. The contract is short‑term (approximately 2 months), requires compliance with NYC prevailing‑wage and M/WBE participation goals (30 % minority/female), and imposes specific insurance and indemnity obligations. No bonds are required, and the submission deadline is August 5, 2026.
• Remove ~99 metal‑halide flood fixtures and ~30 pedestrian fixtures on Pier 1.
• Supply and install Beacon‑brand LED flood and pedestrian fixtures, custom visor/bracket with RAL 9007 finish.
• Connect fixtures to existing 0‑10 V wiring and integrate with Lutron control system (including a new “Movie Lawn” control mode).
• Provide testing, commissioning, documentation, and meet a 30 % M/WBE workforce participation target.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.