Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Upgrade the Programmable Logic Controller (PLC) on the…

U.S. Department Of Defense·United States of America

Upgrade the Programmable Logic Controller (PLC) on the Sasebo Portal Crane SP-1

Closes 3/24/2026$200k – $500kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves upgrading the Programmable Logic Controller (PLC) on the Sasebo Portal Crane SP-1. The contractor will be responsible for conducting an onsite survey, preparing and submitting the PLC upgrade plan, providing the necessary items, upgrading the PLC, facilitating Government inspection, conducting an operational test, and providing finalized as-built drawings and documentation. The contractor will also be required to train Government employees on the updated PLC system maintenance and operations. The project is expected to be completed within a period of 12 months, from 7/1/2026 to 6/30/2017, although the actual period of performance and delivery date will be specified upon award. • The contractor must conduct an onsite survey of SP-1 to verify the components to be updated. • The contractor must prepare and submit the PLC upgrade plan, parts list, drawings, manuals, and other documentation for Government review prior to onsite work. • The contractor must provide the items listed in the attachment (1) to the delivery location. • The contractor must upgrade the PLC and remove old components as required. • The contractor must facilitate Government inspection of the updated components and conduct an operational test to verify satisfactory operation of the crane after the update. • The contractor must provide finalized as-built drawings, parts list, manuals, and other documentation post Government inspection and operational test. • The contractor must train the Government employees on the updated PLC system maintenance and operations.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
3/20/2026
Closes
3/24/2026
Duration
12 months

Last updated

Details

Type
Sole Source
Industry
Manufacturing
NAICS
335313

Budget estimate

$200,000 – $500,000

The budget for this project can be estimated based on the scope of work, which involves upgrading the Programmable Logic Controller (PLC) on the Sasebo Portal Crane SP-1. Considering the complexity of the project and the required labor, materials, and equipment, a rough estimate of the budget could be between $200,000 and $500,000. This estimate may vary depending on the actual requirements and the contractor's bid. Factors that may influence the likely payment range include the cost of labor, materials, and equipment, as well as any additional services or support required by the Government.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Energy·New York

Top match · 70%

Oxford PlasmaLab 100 tool PLC upgrade or its Equivalent

Closes 11/6/2026Opened 10/21/2026

North Carolina Town of Cary·North Carolina

69% match

Swift Creek Pump Station PLC Improvements

Closes 11/9/2026Opened 10/15/2026

U.S. Department Of Defense·Pennsylvania

68% match

Programmable Logic Controller (PLC) Parts

Closes 11/13/2026Opened 10/29/2026

National Aeronautics And Space Administration·Alabama

67% match

Lab 104 Cell E PLC

Closes 11/4/2026Opened 10/22/2026

U.S. Department Of Defense·New Jersey

67% match

Crane Hoist and Conductor Bar Upgrade

Closes 11/30/2026Opened 10/30/2026

Jacksonville Port Authority·Florida

66% match

BIMT ZPMC Cranes #10776 & #10778 Elevator Rack Replacement

Rolling / TBD closeOpened 4/8/2026

West Basin Municipal Water·California

66% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

Virginia Department of Transportation·Virginia

66% match

Coleman Bridge HPU Integration

Closes 11/9/2026Opened 10/30/2026

U.S. Department Of Defense·Oklahoma

66% match

Upgrade X-Ray Controller

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

66% match

CRANE,FLOOR,PORTABL

Closes 11/23/2026Opened 10/22/2026

West Basin Municipal Water District·California

66% match

Torrance Refinery Water Recycling Plant Programmable Logic Controller Replacements

Closes 11/5/2026Opened 9/23/2026

U.S. Department Of Justice·Mississippi

65% match

Elevator Control System Modernization – FCC Yazoo City (Low II)

Closes 11/6/2026Opened 10/20/2026

Contra Costa Water District·California

65% match

City of Brentwood Water Treatment Plant Actuator and Control System Upgrades

Closes 11/10/2026Opened 10/1/2026

San Gabriel Unified School District·California

64% match

Project: 2026-BID-SG-04 ATTACHMENT AA

Rolling / TBD closeOpened 5/1/2026

U.S. Department Of Defense·Iowa

64% match

CONTROLLER MONITOR

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·Alabama

64% match

Low Level Cranes- CSO

Closes 11/9/2026Opened 10/7/2026

City of Long Beach·California

64% match

Jib Crane Replacement

Closes 11/19/2026Opened 9/23/2026

U.S. Department Of Defense·Pennsylvania

64% match

16--MOTOR CONTROLLER OB, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 9/15/2026

U.S. Department Of Defense·Massachusetts

64% match

RFI Process control system plumbing and programming

Closes 11/26/2026Opened 10/27/2026

U.S. Department Of The Interior·Nevada

64% match

Z--CABLEWAY CRANE REFURBISHMENT

Closes 12/18/2026Opened 8/11/2026

U.S. Department Of Defense·United States of America

64% match

ACTIVE VEHICLE BARRIERS AND ASSOCIATED CONTROL SYSTEM AT OSAN AIR BASE

Closes 11/3/2026Opened 9/30/2026

Town of Arlington·Massachusetts

64% match

Oil Hydraulic Elevator Improvements - Police Headquarters

Closes 11/3/2026Opened 9/17/2026

U.S. Department Of Defense·California

63% match

Vandenberg Crane Replacement

Closes 11/23/2026Opened 10/20/2026

U.S. Department Of Defense·New Jersey

63% match

Gantry Crane

Closes 11/7/2026Opened 10/22/2025

Florida School for the Deaf and the Blind (FSDB)·Florida

63% match

PUBLIC ANNOUNCEMENT FOR HVAC CONTROL UPGRADES (PHASE II) RFP-27-047

Closes 12/9/2026Opened 10/23/2026