The East Bay Municipal Utility District is seeking a qualified professional engineering consultant to develop a comprehensive Power Generation System (PGS) Master Plan for its Main Wastewater Treatment Plant. The effort includes project management, data collection, risk assessment, alternatives analysis, capital‑project road‑mapping, and a final Master‑Plan report, with an optional flare‑capacity assessment. The work must be performed by a team with civil/mechanical engineering licenses, and a mandatory site walk is required.
• Mandatory site walk on September 22 2026 at the Main Wastewater Treatment Plant (attendance required).
• Deliverables span from data review and assumptions (Task 2) through alternatives screening, refined analysis, a 30‑year capital roadmap, and a final master‑plan report (Tasks 3‑5).
• Optional services include flare troubleshooting, gas‑conditioning system tuning, electrical conductor condition assessment, and low‑pressure gas‑header redundancy study.
• Contract is cost‑reimbursement; the District will negotiate a not‑to‑exceed ceiling after award.
• Evaluation emphasizes understanding of the project, technical approach, relevant biogas‑generation experience, staffing level‑of‑effort, references, and oral presentation, with a 5‑point preference for SBE/DVBE firms.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.