The City of Pembroke Pines is seeking bids from qualified firms to install a 40-ton air-cooled chiller with related mechanical and electrical upgrades at Studio 18. The installation of a new chiller unit, including all necessary mechanical and electrical upgrades, is required to ensure uninterrupted operation and efficiency of Studio 18. The scope of work includes providing and installing a new 40-ton air-cooled chiller, constructing a new concrete foundation pad, installing Schedule 40 black steel chilled water piping with insulation, and providing expansion tank, air separator, strainer, and bladder tank. The contractor must comply with the Florida Building Code, NEC, and all local amendments, and obtain and pay for all required permits, fees, and inspections.
• Provide and install a new 40-ton air-cooled chiller (Trane CGAM040A2 or approved equal)
• Construct a new concrete foundation pad (per structural detail S-1.0) with a minimum of 4,000 PSI
• Install Schedule 40 black steel chilled water piping with insulation as specified
• Provide expansion tank, air separator, strainer, and bladder tank
• Cap and abandon existing district chilled water piping as per plans
• Connect to existing chilled water riser and AHUs
• Provide factory startup, testing, and balancing
• Remove existing 200A service meter; provide and install new 400A, 3-phase, 4-wire FPL-approved service
• Install a new NEMA 4X outdoor-rated panelboard with feed-thru lugs and integrated surge protection
• Install a new grounding system with two (2) 10-foot ground rods and associated copper conductors
• Provide new disconnects, conduits, feeders, grounding, and bonding per NEC
• Install a new GFCI weather-resistant duplex receptacle for the chiller controller
• Coordinate with FPL for service shutdowns and transformer tie-in
• Provide as-built drawings, panel schedules, and labeling
• Provide with final payment all releases of liens, warranty, final project certification letter, inspection & test results, and as-built documentation