The California Department of Forestry and Fire Protection (CAL FIRE) is seeking a qualified contractor to replace the existing 20,000‑GPD extended‑aeration wastewater treatment plant at the Pilot Rock Fire Center with a new pre‑engineered membrane bioreactor (MBR) system. The scope includes full engineering, design, permitting, equipment procurement, demolition of the old plant, installation of the new MBR system, integration with CAL FIRE’s XIO SCADA platform, commissioning, operator training, and a two‑year warranty. The project must meet seismic design criteria (0.97 g PGA), handle flows from 5,000 GPD up to 25,000 GPD, and provide a temporary treatment solution during transition. All work must comply with California Title 22 water‑quality standards, prevailing‑wage rules, and include online standby equipment for redundancy.
• Engineering, design, and permitting for a seismic‑compliant MBR plant (5‑25 K GPD).
• Removal of the existing sludge plant, site preparation, and installation of new equipment with SCADA integration.
• Full warranty, 24‑hour response, and training for CAL FIRE personnel.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.