Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›2703M01 - Crescent Elementary Boiler Replacement Project

Iberville Parish School Board·Louisiana

2703M01 - Crescent Elementary Boiler Replacement Project

Closes 8/10/2026$150k – $300kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Iberville Parish School Board is soliciting sealed bids for the complete replacement of the boiler system at Crescent Elementary School (Project #2703M01). The scope includes removal of the existing boiler, supply and installation of a new high‑efficiency boiler, associated piping, controls, and commissioning. All work must comply with the posted specifications and drawings, and bidders must attend the mandatory pre‑bid conference. • Replace the existing elementary‑school boiler with a new, code‑compliant unit (including all associated mechanical, electrical, and control components). • Provide complete engineering documentation, installation, testing, and commissioning services. • Submit sealed bids by the deadline (August 10, 2026 2 PM CDT) after attending the mandatory pre‑bid meeting on July 30, 2026. • All bids are subject to encryption and will be opened immediately after the deadline at the IPSB Maintenance Office. • Documentation, specifications, and drawings are available for download from the Central Bidding portal.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Evan Cagnolatti(Maintenance & Facility Director)

Key dates

Opened
7/16/2026
Pre-bid meeting
7/30/2026Mandatory
Closes
8/10/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238220
Solicitation №
9601358

Budget estimate

$150,000 – $300,000

The project involves a full boiler replacement for an elementary school, which typically ranges from $150 K to $300 K depending on equipment size, site conditions, and ancillary work such as pipe rerouting and controls. Given the school setting and the need for a high‑efficiency system, the lower bound reflects a basic replacement, while the upper bound accounts for premium equipment and extensive integration.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Horry Georgetown Technical College·South Carolina

Top match · 72%

Grand Strand Dental Building Boiler Replacement

Closes 11/16/2026Opened 10/27/2026

U.S. Department Of Veterans Affairs·Wisconsin

71% match

Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295

Closes 11/18/2026Opened 10/6/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

71% match

Replacement of Four Boilers – Project C1100‑00

Closes 11/24/2026Opened 9/28/2026

Coastal Carolina University·South Carolina

71% match

Singleton Energy Plant Boiler Replacement

Closes 11/5/2026Opened 10/13/2026

University of the District of Columbia·District of Columbia

71% match

AHU Replacement & New Boiler

Rolling / TBD closeOpened 3/17/2020

Christopher Newport University·Virginia

70% match

IFB 242-B5242-002, Forbes Hall Boiler Replacement

Closes 11/17/2026Opened 9/28/2026

U.S. Department Of Defense·Utah

70% match

16292 Steam Boiler Replacement

Closes 11/11/2026Opened 10/2/2026

U.S. Department Of Veterans Affairs·California

70% match

Z1DA--FY27 NRM - Replace B98 and B88 Boiler and Sump Pumps

Closes 11/3/2026Opened 10/27/2026

CUNY Baruch College·New York

69% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

City of Appleton·Wisconsin

69% match

WTP BOILER REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

69% match

REQ6834 Domestic Water Boiler Replacement at Baton Rouge Metro Airport

Closes 11/5/2026Opened 9/24/2026

Newark Board of Education·New Jersey

69% match

10285 Boiler Tube Replacement Repair Patching and Caulking Services

Closes 11/19/2026Opened 10/29/2026

North Carolina Union County·North Carolina

69% match

IFB 2026-068 Rebid IFB Detention Center Boilers Replacement

Closes 11/4/2026Opened 10/20/2026

Ohio·Ohio

69% match

BOILER MAINTENANCE

Closes 11/16/2026Opened 10/30/2026

City of St. Joseph·Missouri

68% match

Wastewater Treatment Boiler Rebuild

Closes 11/11/2026Opened 10/26/2026

North Carolina Department of Adult Correction·North Carolina

68% match

North Carolina Department of Adult Correction

Closes 11/5/2026Opened 9/22/2026

U.S. Department Of Veterans Affairs·Oregon

68% match

Boiler Plant O2 Sensor Replacement

Closes 11/3/2026Opened 10/27/2026

Town of Bridgton·Maine

68% match

Town of Bridgton Request for Proposals - Boiler Replacement Project

Closes 11/10/2026Opened 10/14/2026

Newark Board of Education·New Jersey

68% match

Boiler Tube Replacement Repair Patching and Caulking Services

Closes 11/19/2026Opened 10/30/2026

Columbus City Schools·Ohio

68% match

CCS Project No.27008B - Partial Roof Replacement at Highland ES

Closes 11/5/2026Opened 10/21/2026

City of Dayton, Ohio·Ohio

68% match

Miami Water Treatment Plant Boiler Replacement

Closes 11/5/2026Opened 10/15/2026

North Carolina Cumberland County Engineering & Infrastructure Department·North Carolina

68% match

Cliffdale Library Boiler Replacement

Closes 11/4/2026Opened 10/7/2026

Michigan Detroit Public Schools Community District·Michigan

67% match

27-0052 FMP Series 6 Roof Replacement for Cass Tech, Emerson

Closes 11/13/2026Opened 10/29/2026

California Department of General Services·California

67% match

25-315494.FMD.BoilerMaintenance

Closes 11/4/2026Opened 9/29/2026

Lynwood Unified School District·California

67% match

Abbott Elementary School HVAC Units Replacement Project (Bid No. 03MOT27)

Closes 11/4/2026Opened 10/1/2026