The State of Iowa is seeking to replace the Water Treatment Control System at the Fort Dodge Correctional Facility. The proposed system shall include a wall-mounted analyzer panel capable of real-time pH and temperature monitoring with a programmable controller and data logging capability. It must feature an in-line modular sensor housing, a resistance thermometer, and associated plumbing, wiring, and pressure regulation components including backflow preventer. The chemical feed system must consist of a pre-assembled, skid-mounted dual-pump sodium hydroxide injection package.
• The system must be factory tested, rated for continuous industrial use, and compliant with applicable safety and performance standards.
• The selected contractor will be responsible for delivery, installation, integration with existing water systems, and startup testing.
• Pricing shall be all-inclusive.
• A site visit may be scheduled upon request.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.