The US Coast Guard is seeking a contractor to perform insulation renewal on a 45-foot Response Boat - Medium (RB-M) while dry-docked at USCG Base Miami Beach Industrial Production Facility. The contractor will be responsible for installing insulation in the Engine Room Machinery Space, including Port and Starboard Engine Room Air Intakes, and repairing insulation in the Pilot House and survivor compartment. The contractor must provide trained, qualified personnel, and any required special tools or equipment necessary to complete the work.
• The installation process will involve using specific materials, including Pyrotek "QUADZERO" sound attenuation barrier and Owens Corning 2" Foil-Faced "Insul-Quick" insulation.
• The contractor will be required to arrange for disposal of existing lead-lined insulation and replace any damaged pins found upon insulation removal.
• The performance period is estimated to be late November to early December 2025, with exact periods of performance scheduled by the COTR at least two weeks prior to start.
• Work hours will be Monday through Friday, excluding holidays, during the hours of 6:30 am to 3:00 pm.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.