The Washington Suburban Sanitary Commission (WSSC) is soliciting sealed bids for the construction of a new pre-engineered metal building structure and enclosure for the Temple Hills Jet Truck Garage. The project includes site work, utilities, grading, paving, stormwater management, and landscaping. The contractor must have experience with construction of buildings and architectural systems, electrical systems, instrumentation and controls, and HVAC systems. The project duration is approximately 365 calendar days.
• The building is approximately 5,500 SF (one story) to accommodate six truck bays.
• New concrete foundations and slab-on-grade for the pre-engineered building.
• New doors, frames, and hardware.
• New fire extinguishers and bollards.
• New HVAC equipment, unit heaters, exhaust fans, and air louvers with dampers.
• New indoor light fixtures, exit signs, outdoor wall packs and pole light.
• New transformer, electrical panels, conduit from main building, wiring, and services.
• Three new outdoor parking spaces with receptacles for CCTV trucks.
• Sitework, including utilities, grading, paving, stormwater management, and landscaping.