Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Vermont guideVermont Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Vermont
  4. ›Energy and Utilities
  5. ›Solar PV and Battery Storage Project Design & Construction

Town of Cabot·Vermont

Solar PV and Battery Storage Project Design & Construction

Closes 9/3/2026$500k – $1.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Cabot is seeking proposals for the design, installation, and construction of a solar PV and battery storage system for two municipal parcels, the Wastewater Treatment Facility and the Willey Building. The project aims to provide 100% of the future energy needs for the facilities and includes the installation of roof-mounted and ground-mounted solar panels, as well as a battery backup system. The selected contractor will be responsible for coordinating with town representatives, obtaining necessary permits, and providing system documentation and maintenance information. • The project includes the design and installation of a solar PV system for both the Wastewater Treatment Facility and the Willey Building • The system must provide 100% of the future energy needs for the facilities • The contractor must coordinate with town representatives and obtain necessary permits • The contractor must provide system documentation and maintenance information • The project includes the installation of a battery backup system for both buildings

Attached files

Contact

Amy Monahan(Treasurer)

[email protected]

(802) 563-2279 Ext. 1003

Key dates

Opened
8/10/2026
Questions due
8/25/2026
Closes
9/3/2026
Duration
120 days

Last updated

Details

Type
Request for Proposal
Industry
Energy and Utilities
NAICS
237130
Solicitation №
75044

Budget estimate

$500,000 – $1,500,000

The estimated budget for this project can be estimated based on the scope of work and the requirements of the RFP. The project involves the design and installation of a solar PV system and a battery backup system for two municipal parcels. The cost of such a project can vary widely depending on the size of the systems, the equipment used, and the labor costs. However, a rough estimate for a project of this scope could be in the range of $500,000 to $1,500,000. This estimate is based on industry standards for solar panel installations and battery backup systems, as well as the need for electrical contractors and other specialists to complete the work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Connecticut City of Stamford·Connecticut

Top match · 76%

City Design Build RFP –Terry Conners Ice Rink Solar Photovoltaic (PV) & Battery

Closes 12/17/2026Opened 10/22/2026

City and County of Butte-Silver Bow·Montana

73% match

Butte-Silver Bow Library Solar Project

Closes 11/10/2026Opened 10/22/2026

Maryland Wicomico County Board of Education·Maryland

71% match

BENNETT MIDDLE SCHOOL SOLAR POWER SYSTEM PROJECT

Closes 11/12/2026Opened 10/13/2026

North Carolina Mecklenburg County·North Carolina

70% match

Bette Rae Thomas Recreation Center PV Panel Installation

Closes 11/24/2026Opened 10/29/2026

Georgia City of Tybee Island·Georgia

70% match

RFP2026-113 Solar Installation on Tybee Island Marine Science Center

Closes 11/3/2026Opened 10/3/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

69% match

Engineer and Construct a Renewably Powered Battery-Coupled DC Fast Charging Network for the GVI, USV

Closes 11/5/2026Opened 10/7/2026

Port of Stockton·California

69% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

New York State Energy Research and Development Authority·New York

68% match

Sun and Soil Program

Closes 12/10/2026Opened 9/16/2026

County of Kauai·Hawaii

68% match

Kealaula Supportive Housing Phase II Photovoltaic Design Build Project

Closes 11/30/2026Opened 10/23/2026

New York State Energy Research and Development Authority·New York

68% match

Affordable Solar and Storage Predevelopment and Technical Assistance

Closes 12/31/2029Opened 12/19/2024

Kansas City Area Transportation Authority·Missouri

67% match

Design-Build Battery Electric Bus (BEB) Charging Infrastructure and Canopy

Closes 12/29/2026Opened 11/16/2026

U.S. Department Of Defense·California

66% match

U.S. Army 63rd Readiness Division MILCON ERCIP Microgrid

Closes 3/31/2027Opened 3/31/2026

NYSERDA·New York

66% match

Sun and Soil Program

Closes 12/10/2026Opened 9/16/2026

City of Vista·California

66% match

Solar Streetlight Project - Phase 3 (CIP No. 8385)

Closes 11/25/2026Opened 10/22/2026

City of Corona·California

66% match

City of Corona Electric Utility Battery Energy Storage System Feasibility Study

Closes 11/19/2026Opened 10/5/2026

Louisiana City of New Orleans·Louisiana

66% match

Solar Development - Agriculture ST.

Closes 11/11/2026Opened 10/23/2026

North Carolina UNC - System Office Design/Construction·North Carolina

66% match

UNC-Chapel Hill

Closes 11/3/2026Opened 10/8/2026

The University of North Carolina·North Carolina

65% match

Frank Porter Graham Student Union - Solar Array Expansion

Closes 11/3/2026Opened 10/8/2026

U.S. Department Of Defense·Ohio

65% match

Government Requirement for Advanced Power and Energy (GRAPE)

Closes 12/31/2027Opened 8/25/2025

Northeast Wisconsin Technical College·Wisconsin

65% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

Victor Valley Transit Authority·California

65% match

Building Modifications Hydrogen Fuel Cell Bus Maintenance

Closes 11/19/2026Opened 10/12/2026

California Department of Transportation·California

64% match

Install capture housing, landscape, and electrical.

Closes 11/4/2026Opened 9/28/2026

Northwest Arctic Borough·Alaska

64% match

RFP NO. 27-01 Battery Energy Storage Systems (ORV/IAN/AMB)

Closes 11/19/2026Opened 10/22/2026

Victor Valley Transit Authority·California

64% match

Building Modifications for Hydrogen Fuel Cell Bus Maintenance

Closes 11/19/2026Opened 10/9/2026

Pinellas County·Florida

64% match

Design and Construction of Power Distribution Center at the County Solid Waste Disposal Complex - Design Build (Rebid)

Closes 12/1/2026Opened 10/30/2026