Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Alabama guideAlabama Bids and Bidding Guide
  • Telecommunications RFPsTelecommunications Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More telecommunications bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Alabama
  4. ›Telecommunications
  5. ›Campus Drive Fiber Optic Relocation

City of Tuscaloosa·Alabama

Campus Drive Fiber Optic Relocation

Closes 5/5/2026$200k – $800kInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Tuscaloosa is seeking qualified contractors to relocate existing fiber optic infrastructure along Campus Drive and Highway 82 (McFarland Blvd.). The work includes removal of existing conduit, installation of new conduit, pulling new fiber optic cable, and restoring the site to pre‑construction conditions. The project must be completed in accordance with the City’s specifications and local utility regulations, with all work performed under a sealed‑bid process. • Relocate fiber optic cable in the vicinity of Campus Drive and Highway 82. • Provide all labor, materials, equipment, and permits required for conduit removal, new conduit installation, and fiber pulling. • Complete work within the contract period and comply with City engineering specifications, safety standards, and post‑construction restoration requirements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jason L. Coker(Project Contact)

[email protected]

(205) 561-0808

Key dates

Opened
4/8/2026
Pre-bid meeting
4/21/2026Mandatory
Closes
5/5/2026

Last updated

Details

Type
Invitation for Bid
Industry
Telecommunications
NAICS
237130
Solicitation №
Invitation for Bids: 87283908

Budget estimate

$200,000 – $800,000

No contract value is disclosed, but similar municipal fiber‑optic relocation projects in Alabama typically range from $200,000 to $800,000 depending on length of fiber, site conditions, and required permits. The estimate assumes 0.5–1.5 miles of conduit work, moderate urban traffic constraints, and standard material costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Colby Community College·Kansas

Top match · 67%

Fiber Installation for Dorm and Maintenance Building (PDF)

Closes 12/1/2026Opened 10/16/2026

Clemson University·South Carolina

67% match

Off Campus Fiber Builds

Closes 6/10/2029Opened 6/13/2024

Michigan Wayne-Westland Community School District·Michigan

67% match

DISTRICT FIBER UPGRADES

Closes 11/18/2026Opened 10/16/2026

Columbia Public Schools·Missouri

67% match

RFP NO C 28006 wan fiber services to various district locations

Closes 11/16/2026Opened 10/12/2026

Columbia Public Schools·Missouri

66% match

RFP NO C 28005 wan fiber services city

Closes 11/16/2026Opened 10/12/2026

Michigan Caledonia Community Schools·Michigan

65% match

RFP - District Fiber Renovations

Closes 11/20/2026Opened 10/30/2026

Clemson University·South Carolina

64% match

Emergency Cable Repairs

Closes 2/27/2029Opened 3/20/2024

Robla School District·California

63% match

RFP 23-103 Leased Dark or Lit Fiber Service Questions and Answers

Rolling / TBD closeOpened 4/20/2026

NYS Onondaga County·New York

63% match

FIBER OPTIC DESIGN AND OPTIONAL CONSTRUCTION MANAGEMENT

Closes 11/27/2026Opened 10/29/2026

Dakota County·Minnesota

62% match

Fiber Optic Outside Plant and Inside Plant Services

Closes 11/24/2026Opened 10/29/2026

City of Charlotte·North Carolina

62% match

Nevin Rd and W Sugar Creek Rd ITS

Rolling / TBD closeOpened 1/1/2027

City of Charlotte·North Carolina

62% match

Mt Holly-Huntersville Road Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

Robla School District·California

62% match

OPEN:

Closes 11/23/2026Opened 10/9/2026

Michigan Lake Shore Public Schools·Michigan

62% match

Tech Upgrades

Closes 11/11/2026Opened 10/26/2026

University of Missouri System·Missouri

62% match

Data Transport Services and Dark Fiber

Closes 12/11/2026Opened 10/22/2026

Oregon Confederated Tribes of Siletz Indians·Oregon

61% match

Construction of Outside Plant Fiber Optic Infrastructure PHASE 1

Closes 12/9/2026Opened 10/26/2026

U.S. Department Of Energy·Idaho

61% match

Fiber Dial Room Refurbishment

Closes 12/11/2026Opened 2/25/2026

Baltimore County, Maryland·Maryland

61% match

Fiber Optic Construction and Related Services

Closes 1/14/2027Opened 10/21/2026

City of Bakersfield·California

61% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 11/5/2026Opened 10/8/2026

Robla School District·California

61% match

OPEN:

Closes 11/23/2026Opened 10/9/2026

City of Charlotte·North Carolina

61% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027

Oregon Northern Wasco County PUD·Oregon

61% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

Clemson University·South Carolina

60% match

Twisted Pair and Optical Fiber Cabling

Closes 2/20/2028Opened 3/7/2023

U.S. Department Of The Interior·California

60% match

Y--Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up

Closes 11/16/2026Opened 10/30/2026

Utility Board of the City of Key West·Florida

60% match

Specifications for Fiber Optic Services and Materials

Closes 11/6/2026Opened 9/14/2026