The City of Hoschton, Georgia is seeking bids for the construction of the Barrow County Water Supply Connection - Phase I. The project involves the installation of approximately 350 LF of 12-inch restrained joint DIP waterline, 300 LF horizontal directional drilling of 20-inch DR17 IPS HDPE with a 12-inch DR9 DIPS HDPE carrier pipe, connections to existing waterlines, a 6-ft x 12-ft solenoid control valve vault, electrical and SCADA, valves and associated appurtenances. The successful bidder will be required to furnish the owner with insurance, workman's compensation insurance, and performance and payment bonds in the amount of one-hundred percent (100%) of the total bid.
• The project requires the installation of a 12-inch restrained joint DIP waterline and horizontal directional drilling of a 20-inch DR17 IPS HDPE with a 12-inch DR9 DIPS HDPE carrier pipe.
• The project includes connections to existing waterlines, a solenoid control valve vault, electrical and SCADA, valves, and associated appurtenances.
• The successful bidder will be required to comply with all federal, state, and local laws.
• The project has a completion time of ninety (90) consecutive calendar days from the date of a written "Notice to Proceed" from the owner.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.