The University of Texas at San Antonio, in partnership with TxDOT, is seeking a qualified contractor to design‑build and construct new sidewalks, shared‑use paths, and dedicated bike lanes across four campus avenues, including related roadway improvements, drainage, lighting, signage, pavement markings, landscaping, and utility adjustments. The contract will be awarded on a low‑bid basis, requiring compliance with TxDOT standards, submission of a bid bond, and adherence to UTSA’s contractual terms.
• Scope covers construction of sidewalks and separated bike lanes along Brenan Ave, Ximenes Ave, George Brackenridge Ave, and Barshop Blvd (SL 1604 to UTSA Blvd).
• Includes extensive civil‑engineering work: excavation, pavement, curb ramps, retaining walls, drainage, illumination, signing, and landscaping amenities.
• Contractor must be pre‑qualified by TxDOT via the Confidential Questionnaire and provide required bonds, DBE plans, and non‑collusion certification.
• Estimated engineering cost ≈ $8.6 M; project schedule anticipates start mid‑December 2026 with completion by December 2027.
• All bids submitted electronically through the UTSA Jaggaer/SciQuest portal; pre‑bid conference held 9 Sep 2026 (virtual) and Q&A deadline 15 Sep 2026.