Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Civil Engineering
  5. ›RFQ - Galvanized Pipe Replacement

North Carolina Cape Fear Public Utility Authority·North Carolina

RFQ - Galvanized Pipe Replacement

Closes 4/7/2026$750k – $1.5MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Cape Fear Public Utility Authority (CFPUA) is seeking consulting engineering firms to provide design and contract administration services for a project to replace existing galvanized water system piping in the Town of Wrightsville Beach. The project aims to increase CFPUA's water infrastructure reliability. The selected firm will be responsible for replacing approximately 6,298 linear feet of galvanized water lines and abandoning 3,087 linear feet of galvanized water lines. The firm will also provide construction administration and observation-based services. Key aspects of the project include: • Replacing galvanized water system piping with an alternate material • Developing contract drawings and technical specifications • Obtaining necessary permits and encroachment agreements • Assisting in the bidding process • Providing construction administration and observation-based services

Attached files

Contact

Ben Guerrieri(Procurement Manager)

[email protected]

(910) 332-6472

Key dates

Opened
3/5/2026
Questions due
3/24/2026
Closes
4/7/2026
Duration
60 days

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
345-03-05-2026

Budget estimate

$750,000 – $1,500,000

The budget for this project can be estimated based on the scope of work, which includes replacing approximately 6,298 linear feet of galvanized water lines and abandoning 3,087 linear feet of galvanized water lines. The cost of materials, labor, and other expenses will influence the overall budget. Assuming an average cost per linear foot of $100-$200, the total cost for replacing the galvanized water lines could be around $629,800 to $1,259,600. Additionally, the cost of abandoning the remaining 3,087 linear feet of galvanized water lines and other project expenses should be considered. A reasonable estimate for the total budget could be in the range of $750,000 to $1,500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Cape Fear Public Utility Authority·North Carolina

Top match · 70%

RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock

Closes 11/5/2026Opened 10/7/2026

North Carolina Cape Fear Public Utility Authority·North Carolina

70% match

RFQ - Condition Evaluation for Replacement of Pump Station #33 Shamrock

Closes 11/5/2026Opened 10/8/2026

Georgia State University·Georgia

69% match

GSU - RFQ Replace Terminal Units, Clarkston Building CH, Ground, 1st, and 2nd Floors

Closes 11/12/2026Opened 10/13/2026

City of Tampa, Florida·Florida

69% match

RFQ 27-D-00003 43rd St. Pump Station Force Main Replacement Design

Closes 12/3/2026Opened 10/30/2026

Virginia Tech·Virginia

68% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

Town of Bridgton·Maine

68% match

RFPs Requested – Town Boiler System Replacement

Closes 11/10/2026Opened 10/14/2026

Town of Ponce Inlet·Florida

68% match

RFQ 2026-02 - TOWN OF PONCE INLET COLLECTION SYSTEM IMPROVEMENTS PHASE 1

Closes 11/19/2026Opened 10/20/2026

City of Redlands·California

68% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Tarrant Regional Water District·Texas

67% match

RFSOQ for Electrical Support

Closes 11/19/2026Opened 10/12/2026

U.S. Department Of Energy·New Jersey

67% match

RF Roof Replacement Project

Closes 12/10/2026Opened 10/30/2026

County of Fairfax·Virginia

67% match

RFQ-BASIC ORDER AGREEMENT FOR HISTORIC IMPROVEMENT, RENOVATIONS, REPAIRS, AND PRESERVATION

Closes 11/12/2026Opened 10/8/2026

Bristol Virginia Utilities Authority·Virginia

67% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Western Virginia Water Authority·Virginia

67% match

INVITATION TO BID: WYCLIFFE AVE WATERLINE REPLACEMENT

Closes 12/2/2026Opened 10/23/2026

State of Alabama·Alabama

67% match

Fann - Pipe Replacement

Closes 11/3/2026Opened 10/29/2026

Snohomish County PUD·Washington

67% match

RFQ - Underground Triplex and Quadruplex Wire

Closes 11/4/2026Opened 10/21/2026

Connecticut Town of Stafford·Connecticut

67% match

RFQ: On-Call Engineering Services for Wastewater-Related Needs

Closes 11/17/2026Opened 10/28/2026

Board of Regents of the University System of Georgia·Georgia

66% match

GSU - RFQ Replace Terminal Units, Clarkston Building CH, Ground, 1st, and 2nd Floors

Closes 11/12/2026Opened 10/13/2026

College of Coastal Georgia·Georgia

66% match

CCGA - 2706 Camden HVAC Pump Replacements

Closes 12/3/2026Opened 10/26/2026

Lorain County·Ohio

66% match

RFQ - Design and Engineering Services

Closes 11/6/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

66% match

POWER SUPPLY

Closes 11/9/2026Opened 10/28/2026

Virginia Polytechnic Institute and State University·Virginia

66% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

City of Billings·Montana

66% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/1/2026

City of Billings·Montana

66% match

W.O. 26-08: WRF Digester Gas Pipe Replacement

Closes 11/4/2026Opened 10/2/2026

Hilton Head Public Service District·South Carolina

66% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

U.S. Department Of Veterans Affairs·Nevada

66% match

Z1DZ--Replace Dental Vacuum Piping

Closes 11/17/2026Opened 10/19/2026