Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›District Thermal Energy Network

NYS State University Construction Fund·New York

District Thermal Energy Network

Closes 7/22/2026$40M – $60MRequest for InformationLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State University Construction Fund (the Fund) is issuing this Request for Information (RFI) to gather information about the market of qualified firms providing comprehensive Design-Build Services for District Thermal Energy Network (DTEN) projects. This RFI is for information and planning purposes only and does not constitute a solicitation or commitment to procure services. Responses will be used to better understand the market of the qualified firms in the industry with interest in working in New York State and with New York State entities. This RFI is being conducted in consideration of several potential DTEN projects in the Fund’s portfolio, beginning with a project at SUNY Purchase in Westchester County (the Project). SUNY Purchase has received $50 million in funding to develop a DTEN on campus. The Project is envisioned to be delivered through the Design-Build (DB) methodology, as authorized by the Infrastructure Investment Act. The Project will include all services required for the complete design and construction of this DTEN. The project’s primary goal is to install a DTEN in the most efficient manner possible. The design must maximize the network’s footprint using current funding while considering future expansion. This will require the DB firm to optimize the following infrastructure components: Geothermal Borefield: Determine the total quantity, configuration, and optimal depth of the bores. Centralized Heat Pumps: Establish the equipment type, unit quantity, and capacities. Distribution Infrastructure: Calculate the maximum number of connectable buildings and size the distribution piping network for future expansion. The Fund invites interested firms to respond to the following questions. The Fund is not soliciting general marketing information, nor is it requesting a formal qualifications submission. Responses should address the questions asked and should be informative and concise. A. Firm Structure & Capabilities 1. Does the respondent provide fully integrated DB services in-house? 2. If not, what key disciplines are performed in-house vs. subcontracted/subconsulted? 3. What is the market of Minority – and Women-owned Businesses Enterprises and Service-Disabled Veteran-Owned Businesses with relevant capability / capacity in this industry? If the respondent knows, do relevant firms have New York Certification in the designated category? 4. Is the respondent registered with the following New York State entities: · Department of State Authorization to do business · Department of Labor Certification · State Education Department Professional Service Entity Registration · Department of Taxation & Finance · Statewide Financial System · Office of the State Comptroller VendRep System B. Relevant Experience 1. Indicate whether the respondent has experience with the following, and if so, provide a brief description of sample projects: · Projects of similar size, scope and complexity within the past 10 years? · DTEN systems, particularly those on college campuses? · Phased build-out of campus DTEN systems? · Building energy modeling for the purpose of sizing DTEN systems? · Campus thermal load analysis · System sizing and optimization 2. Does the respondent have experience with obtaining outside funding (incentives/grants/etc.) for this type of project? 3. Does the respondent have experience completing similar project subject to a Project Labor Agreement? C. Delivery Approach 1. Does the respondent have a clearly defined approach for developing a comprehensive, fully integrated project team throughout all phases of projects that utilize DB? 2. If so, how does this approach differ from the respondent’s approach to team building in Design-Bid Build or other delivery methods? 3. What is the respondent’s recommendation for the structure a DB procurement for a project of this nature (e.g. lump sum award, progressive DB, etc.) and why? D. Procurement / Contracting information 1. Does the respondent know of any contractual terms that would definitively lead to a decision to, or not to, pursue a DB project of this nature with a public client? 2. What Project details and contractual information would the respondent need to be able to respond to a lump sum DB solicitation? 3. What Project details and contractual information would the respondent need to be able to respond to a progressive DB solicitation? Submission Instructions: Respondent‘s complete submission in the format indicated in this RFI, must be uploaded to ShareFile, using the link provided below. Please “click” on the link below and follow instructions on uploading a PDF copy of your complete response. Please name your PDF files as follows: Respondent Name – DTEN RFI https://sucf.sharefile.com/r-r9104ca5a52604652929bcaeb5a0359ea ShareFile will automatically confirm via an on-screen notification (not an email), that your file has successfully uploaded. Responses are due in accordance with the schedule herein. Hard copies of responses are not required and will not be accepted. All inquiries regarding this RFI can only be made to [email protected]. Designated Contacts are: Samantha Lord Kelly Whitbeck Jeremy Clausi Robbilee Luedtke Nora Kanarkiewic

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelly Whitbeck(Procurement Specialist)

[email protected]

(518) 320-1715

Key dates

Opened
7/2/2026
Closes
7/22/2026

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
236220
Solicitation №
2136758

Budget estimate

$40,000,000 – $60,000,000

The budget for this project is estimated to be around $50 million, as mentioned in the document that SUNY Purchase has received $50 million in funding to develop a DTEN on campus. However, this is just an estimate and the actual budget may vary depending on the scope and complexity of the project. The budget may also be influenced by factors such as the project timeline, the number of buildings to be connected, and the type of equipment and materials used.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Denver·Colorado

Top match · 62%

Renewable District Thermal Incentive Program

Closes 12/31/2026Opened 11/2/2023

New York State Energy Research and Development Authority·New York

60% match

On-site Energy Manager Program

Closes 12/31/2030Opened 8/5/2025

Columbia Public Schools·Missouri

60% match

RFP NO C 28005 wan fiber services city

Closes 11/16/2026Opened 10/12/2026

Massachusetts Department of Energy Resources·Massachusetts

59% match

DOER PON-ENE-2025-032 Regional School District Grant Program Opportunity Notice

Closes 3/5/2027Opened 6/4/2025

New York State Energy Research and Development Authority·New York

59% match

Clean Energy Career Pathways Training

Closes 11/23/2026Opened 4/3/2026

Northeast Wisconsin Technical College·Wisconsin

59% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

California Grants·California

59% match

PON-24-002 – K–12 Energy Efficiency Program (KTEP)

Rolling / TBD closeOpened 4/30/2025

Snohomish County PUD·Washington

59% match

Carbon Free Resources (Renewable & Non-Emitting)

Closes 12/4/2026Opened 10/14/2026

New York State Energy Research and Development Authority·New York

58% match

Apprenticeship and Pre-apprenticeship Clean Energy Training

Closes 12/8/2026Opened 6/5/2025

California Energy Commission·California

58% match

PON-24-002 - K–12 Energy Efficiency Program (KTEP)

Rolling / TBD closeOpened 4/23/2025

U.S. Rural Business-Cooperative Service·United States of America

58% match

Renewable Energy Systems and Energy Efficiency Improvements Program

Rolling / TBD closeOpened 10/13/2015

City of Branson·Missouri

58% match

RFP 2890-02 Fire Station 2 Radiant Heating System

Closes 11/4/2026Opened 10/5/2026

U.S. Department Of Energy·Tennessee

58% match

Building Technologies Research and Integration Center: Technology Collaborations for US Building Technologies Industries

Closes 12/13/2028Opened 12/13/2023

Nyack Public Schools·New York

58% match

Capital Projects Update 6-6-23(opens in new window/tab)

Rolling / TBD closeOpened 3/5/2024

City of Phoenix·Arizona

58% match

Residential Energy Audit

Closes 11/6/2026Opened 10/9/2026

New York State Energy Research and Development Authority·New York

58% match

Multifamily Contractor Network

Closes 12/31/2030Opened 3/3/2025

Michigan Trenton Public Schools·Michigan

58% match

District Technology Renovations

Closes 12/3/2026Opened 10/28/2026

Maryland City of Havre de Grace·Maryland

58% match

STAR Centre Energy Audit Project

Closes 11/23/2026Opened 10/19/2026

Connecticut UConn Health Center·Connecticut

57% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

City of Seattle·Washington

57% match

Clean Heat Rebate Administration

Closes 11/13/2026Opened 10/13/2026

Round Rock ISD·Texas

57% match

Wireless Refresh-Districtwide

Closes 11/12/2026Opened 10/14/2026

U.S. Rural Business-Cooperative Service·United States of America

57% match

Renewable Energy Systems and Energy Efficiency Improvements Program

Rolling / TBD closeOpened 10/30/2018

California Grants·California

57% match

Cost-Share for Federal Geothermal Energy Funding Opportunities

Rolling / TBD closeOpened 6/9/2026

Vermont Department of Public Service·Vermont

57% match

Evaluation of Thermal Energy Efficiency Programs in Vermont’s Single Family Residential Existing Buildings Market

Closes 11/10/2026Opened 9/30/2026

Terrebonne Levee and Conservation District·Louisiana

57% match

District Building / Satellite EOC Facility

Closes 11/24/2026Opened 10/23/2026