SCOPE INCLUDES: Selective Demolition; Asbestos Abatement, Rough Framing, Framing Material (Include All Wood Blocking), Plastic Laminate Millwork (Include PLAM Re-Covering & Hardware), Plastic Laminated Wood Paneling, Door Hardware (For Existing Doors), Glazing Surface Films (for Existing Conference Room skylights), Non-Structural Metal Framing, Gypsum Board (Include Demo Patching), Acoustical Panel Ceilings, Resilient Base & Accessories, Resilient Tile Flooring, Wall Coverings, Acoustic Art Panels, Interior Painting, Coat Rack Systems, Manually Operated Roller Shades, HVAC, Electrical, Data & Cabling
WAGE: = Prevailing Wages
TAX: = Exempt
SCHEDULE: = 380 Day Schedule
RFI CUT-OFF DATE: = 4.15.26 @ 12pm
SPECIAL NOTES:
**MBE REQUIREMENTS: 11%**
**WBE REQUIREMENTS: 19%**
**SDVOB REQUIREMENTS: 6%**
**Please See Site Pics on Smart Bid**
** If you are emailing your bid within a half hour of the bid time, PLEASE additionally fax (716-633-6956) it and/or call in your proposal – due to email server delays
** All RFI’s and questions to be forwarded to the contractor via email Jim Musty Jr. at
[email protected] (not the Architect or Owner).
** Bid Proposals should be forwarded in PDF file format please.
** Please forward your scope sheet or proposal by the End of the Day before the bid is due, please, most specifically with your inclusions and exclusions.
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 5.00%
Minority / Women Business Enterprise contracting goals (MWBE)
MBE Goal: 11.00%
WBE Goal: 19.00%