The provided text appears to be a Request for Proposal (RFP) document for a construction project at Cabral Park in Providence, Rhode Island. Here is a summary of the key points: **Project Overview:** * The project involves site improvements at Cabral Park, located at 515 Wickenden Street, Providence, RI. * The project is being managed by the Providence Parks Department. * The project includes demolition, grading, utilities, and construction of new site elements, such as walkways, planting beds, and a splash pad. **Demolition:** * The contractor is responsible for demolishing existing site elements, including asphalt, concrete, fencing, and utilities. * The contractor must coordinate with the Providence Parks Department to develop a demolition plan that minimizes park disturbance and allows all facilities to remain in operation during construction. **Erosion and Sediment Control:** * The contractor is responsible for implementing erosion and sediment control measures to prevent sediment from leaving the site. * The contractor must install all erosion control measures as shown on the design plans and maintain them throughout the construction period. **Construction:** * The contractor is responsible for constructing new site elements, including walkways, planting beds, and a splash pad. * The contractor must conform to the Rhode Island Department of Transportation Standard Specifications for Road and Bridge Construction (2015 Edition). * The contractor must maintain all existing utilities in working order and free from damage during construction. **Planting:** * The contractor is responsible for planting new trees, shrubs, and other vegetation as shown on the plans. * The contractor must supply all new plant material in quantities sufficient to complete the planting shown on the drawings. * The contractor must prune trees in accordance with the specifications and maintain all planted areas until the completion of the maintenance period. **Permits and Approvals:** * The contractor must obtain all required city, state, and federal permits. * The contractor must coordinate with the Providence Parks Department to obtain all necessary approvals and permits. **Warranty and Maintenance:** * The contractor is responsible for maintaining all planted areas for one full growing season from the time of substantial completion. * The contractor must replace any damaged, stolen, dead, declining, or lost plant material until the completion of the maintenance period. Overall, the RFP document outlines the scope of work, responsibilities, and requirements for the contractor to complete the site improvements at Cabral Park.