The Colorado Bureau of Investigation is soliciting bids for a comprehensive HVAC and lighting upgrade at its facility. The scope includes replacement of HVAC equipment, installation of new lighting, integration of a non‑proprietary Honeywell Niagara building automation system (BAS), and associated testing, balancing, and warranty work. The project is classified as prevailing‑wage, requires the contractor to handle any hazardous material testing/abatement, and follows a continuous 35‑month construction schedule with a target completion date of September 1 2029. The estimated total cost is $3.138 million.
• Scope: HVAC equipment replacement, lighting retrofit, BAS installation (Alerton‑specified, Honeywell Niagara only).
• Contract type: Single‑award IFB, open to HVAC, electrical, or qualified contractors (no general contractor requirement).
• Prevailing‑wage project; contractor responsible for hazardous‑material testing/abatement.
• Warranty: 5‑year contractor correction period plus 1‑year manufacturer warranty for BAS; 1‑year warranty for HVAC installation.
• Estimated budget: $3.14 M; construction duration ~35 months, continuous (no phased work).
• Mandatory compliance: Davis‑Bacon Act, EO 13706 (paid sick leave), EO 13658 wage floor.