The City of San Diego is soliciting bids for the “Robb Field Gateway Path” project, which upgrades and expands pedestrian and bicycle infrastructure in the Robb Field / Mission Bay Park area. The contract is a lump‑sum, 220‑working‑day agreement valued at approximately $1.524 million and requires a 10 % bid bond, performance and payment bonds, and compliance with prevailing‑wage, PLA, and SLBE/ELBE participation requirements. The scope includes ADA‑compliant walkway construction, bike‑path replacement, site grading, storm‑drain installation, a retaining wall, new lighting, a drinking‑water fountain, irrigation upgrades, and extensive environmental monitoring (paleontological, archaeological, and biological). Bidders must attend a mandatory pre‑bid meeting on October 7 2026 and submit all required certifications and bond documents electronically via PlanetBids.
• Construction of new ADA‑compliant pedestrian walkway and bike path, including demolition of existing non‑code infrastructure.
• Storm‑water, drainage, retaining wall, lighting, drinking‑fountain, and irrigation system installation with native landscaping.
• Mandatory SLBE/ELBE subcontractor participation (7 % SLBE, 5.5 % ELBE) and compliance with City’s Project Labor Agreement, prevailing‑wage, and environmental monitoring plans.