The Hardy Elementary School Whole‑Site Modernization – Increment 2 (GMP 2) is a Lease‑Leaseback, best‑value construction project for the San Diego Unified School District. Sundt Construction, Inc. is the prime contractor, and the work is divided into numerous bid packages covering general construction, structural steel, concrete, MEP, site work, specialty finishes, and landscaping. Subcontractors must hold the appropriate California contractor licenses, self‑perform at least 15 % of their scope, and comply with prevailing‑wage, DVBE/EBE, and bonding requirements. Key deadlines include a mandatory site walk on 23 Jan 2026, RFIs due 3 Feb 2026, and final bids due 18 Feb 2026. The overall construction budget is $45 M with a schedule from May 2026 to September 2029.
• Multiple trade‑specific bid packages (e.g., steel C‑15, electrical C‑12, plumbing C‑5, HVAC C‑6, concrete C‑11, glazing C‑16, etc.).
• Mandatory pre‑bid site walk and strict pre‑qualification processes (district by 2 Feb, Sundt by 18 Feb).
• Compliance obligations include SB 854 labor standards, prevailing‑wage determination 2025‑2, 3 % DVBE participation, and 15 % self‑performance.