Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Engineering Services
  5. ›751/26148.KMM - Holly SRA - Thread Creek Dam Study

Michigan Department of Technology, Management and Budget·Michigan

751/26148.KMM - Holly SRA - Thread Creek Dam Study

Closes 5/21/2026$100k – $250kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Department of Technology, Management and Budget (DTMB) is seeking professional engineering services to perform a Phase 100 study at the Holly State Recreation Area. The study aims to evaluate the current condition of the Thread Creek Dam and provide options for removal or replacement. The selected firm will be required to provide a complete proposal, including a technical proposal, cost proposal, and reimbursable items. The project timeline is expected to be approximately 12 weeks, with an award of design contract in June 2026 and completion of the Phase 100 study by September 2026. Key services required include topographic survey, soil borings, and geotechnical review of the existing dam. • The project requires a mandatory pre-proposal meeting on May 1, 2026. • The proposal must include meetings as required to fulfill the intent of the contract. • The selected firm will be required to maintain a complete project file of all project documentation. • Reimbursable items include field services, travel expenses, permitting, and testing required for the proper design of the project.

Attached files

Contact

Kurt Maiberger(Project Director)

[email protected]

(517) 899-2693

Key dates

Opened
4/16/2026
Questions due
5/7/2026
Pre-bid meeting
5/1/2026Mandatory
Closes
5/21/2026
Projected award
6/1/2026
Duration
12 weeks

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
RFP-171-260000001797-1

Budget estimate

$100,000 – $250,000

The budget for this opportunity can be estimated based on the scope of work and the reimbursable items listed. The project requires a topographic survey, soil borings, and geotechnical review of the existing dam, which may cost around $17,500. Additionally, the project requires field services, travel expenses, permitting, and testing, which may add to the overall cost. Assuming a moderate complexity of the project and an average billing rate for engineering services, the total budget can be estimated to be between $100,000 and $250,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Michigan Department of Technology, Management & Budget (DTMB)·Michigan

Top match · 70%

472/26613.TAP; Boston Pond - Dam Study

Closes 11/19/2026Opened 10/29/2026

State of Michigan – Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division·Michigan

68% match

751/26612.MAA; Various Dams - Engineering Studies

Closes 12/3/2026Opened 10/22/2026

State of Michigan – Department of Technology, Management and Budget (DTMB)·Michigan

68% match

751/26331.SAA; Hadley SRA - Minnawanna Dam Improvements

Closes 12/2/2026Opened 10/19/2026

Butler County·Ohio

65% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

NYS Capital Region Transportation Council·New York

65% match

Town of Stillwater County Route 76 Corridor Study

Closes 11/27/2026Opened 10/26/2026

City of Salisbury·Maryland

65% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Michigan Department of Environment Great Lakes & Energy – Geologic Resources Management Division·Michigan

65% match

Fisher McCall 12th Ave. OW Plug&Decom 2-Facility 8-wells

Closes 11/19/2026Opened 10/26/2026

City of South Lake Tahoe·California

65% match

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

County of Ontario·New York

65% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

Greenville County·South Carolina

64% match

Huff Creek Watershed Reservoir Maintenance

Closes 11/20/2026Opened 10/30/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

64% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Maryland Town of Port Deposit·Maryland

64% match

RFQ: Susquehanna River Road Corridor Safety, Shared-Use Path and Quarry Park Access Improvements

Closes 11/16/2026Opened 10/16/2026

Delaware Valley Regional Planning Commission·Pennsylvania

64% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

Greenville County·South Carolina

64% match

HUFF CREEK WATERSHED RESERVOIR MAINTENANCE

Closes 11/20/2026Opened 10/30/2026

Town of Bridgton·Maine

64% match

Request for Proposals - Willett Road Engineering Study

Closes 11/19/2026Opened 10/26/2026

Nevada Government·Nevada

64% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Town of Bridgton·Maine

64% match

RFPs Requested – Willett Road Engineering Study

Closes 11/19/2026Opened 10/20/2026

State of Michigan Department of Technology, Management and Budget·Michigan

64% match

472/26279.JLM; Lakeland C.F. - Softener & Salt Storage Upgrd

Closes 11/11/2026Opened 10/16/2026

City of Rogers·Arkansas

64% match

REQUEST FOR LETTERS OF INTEREST - US-71B CORRIDOR STUDY AND RAILYARD LOOP TRAIL UNDERCROSSING STUDY

Closes 11/3/2026Opened 10/13/2026

Massachusetts Town of Spencer·Massachusetts

64% match

Engineering Peer Review Proposals

Closes 12/3/2026Opened 10/30/2026

The Village of Royal Palm Beach·Florida

64% match

SR80 Irrigation Boring

Closes 11/13/2026Opened 10/30/2026

Washakie County Conservation District·Wyoming

64% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Ohio Department of Rehabilitation and Correction·Ohio

64% match

Water Testing Services - CCI - DRC27

Closes 11/9/2026Opened 10/19/2026

Laramie Rivers Conservation District·Wyoming

64% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

City of Cedar Rapids·Iowa

64% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026