Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Energy and Utilities
  5. ›Units 4 &5 Mass Flow Meter Replacement

City of Garland·Texas

Units 4 &5 Mass Flow Meter Replacement

Closes 2/17/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Garland is seeking a contractor to replace the mass flow meters at Units 4 and 5 of the Spencer Plant. The scope of work includes demolition, installation, calibration, training, and documentation. The contractor must provide all labor, materials, equipment, and transportation necessary to perform the work. The project must be completed within a five-day consecutive window. The contractor will be required to provide a schedule and abide by the execution schedule outlined in the document. • The contractor must provide new ABB MVS transmitters, RTD assemblies, communication cards, AO modules, and paddle/orifice plate assemblies. • The contractor must provide required studs, bolts, nuts, gaskets, and installation hardware. • The contractor must provide updated engineering drawings, paddle/orifice plate specifications, flow calculations, and ABB datasheets. • The contractor must provide calibration reports, documentation packages, and PCCU32 configuration setup. • The contractor must provide two days of on-site operational and calibration training in April 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Liz Segura

[email protected]

(972) 205-2416

Key dates

Opened
2/2/2026
Questions due
2/13/2026
Closes
2/17/2026
Duration
5 days

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
334515
Solicitation №
REQ00001388

Budget estimate

$200,000 – $500,000

Based on the scope of work, the budget for this project could range from $200,000 to $500,000. This estimate is based on the cost of the equipment, labor, and services required to complete the project. The actual budget may vary depending on the contractor's bid and the city's budget. Factors that may influence the likely payment range include the cost of the mass flow meters, the complexity of the installation, and the number of personnel required to complete the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The Metropolitan District·Connecticut

Top match · 72%

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

City of Charlotte·North Carolina

69% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

The Ohio State University·Ohio

69% match

OSU-255480 JOC HHW and CHW Meter Replacement

Closes 11/12/2026Opened 10/8/2026

Connecticut Metropolitan District Commission·Connecticut

67% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Arlington County Government·Virginia

67% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

City of Phoenix·Arizona

67% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

Massachusetts Town of Kingston·Massachusetts

64% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Georgia City of Oxford·Georgia

64% match

City of Oxford Water and Electric Meter Replacement

Closes 11/4/2026Opened 9/29/2026

The Metropolitan Water District of Southern California·California

64% match

Furnish one hundred sixty (160) Chemical Flow Meters for the Metropolitan Water District Skinner Plant

Closes 12/7/2026Opened 10/26/2026

Little Blue NRD·Nebraska

63% match

LBNRD Water Meter Replacements

Closes 12/3/2026Opened 10/23/2026

Metropolitan Council·Minnesota

63% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

NYS Rockland County·New York

63% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

City of Bedford, TX·Texas

63% match

Water Meter Installations

Closes 11/12/2026Opened 10/9/2026

Georgia Jones County Board of Commissioners·Georgia

63% match

Water Meter Change Out-2026

Closes 11/5/2026Opened 9/28/2026

Hilton Head Public Service District·South Carolina

62% match

Hilton Head Public Service District Meter Replacement RFQ

Closes 11/10/2026Opened 10/8/2026

Department of Behavioral Health and Developmental Services·Virginia

62% match

NVMHI Replacement of Six (6) Air Handling Units

Closes 11/3/2026Opened 10/1/2026

Michigan

62% match

938-17-16 - Verification, Preventative Maintenance, and Repair Services - Flow Meters

Closes 11/2/2026Opened 10/12/2026

Massachusetts Dracut Water Supply District·Massachusetts

61% match

Well 4 Replacement Project

Closes 11/12/2026Opened 10/14/2026

City of Holly Grove·Arkansas

61% match

City of Holly Grove Water System Improvements – Water Meter Replacement

Closes 11/18/2026Opened 10/25/2026

U.S. Department Of Defense·Ohio

61% match

Vacuum Turbo Pumps

Closes 11/13/2026Opened 10/14/2026

Memphis-Shelby County Schools·Tennessee

61% match

RFP 110226JKG HVAC Replacements 5 Locations

Closes 11/2/2026Opened 10/2/2026

City of Winnebago·Minnesota

61% match

Winnebago, City of Water Meter Replacement BMI Project No. 26X146003

Closes 11/18/2026Opened 10/25/2026

LA Water & Power·California

60% match

146628 OWENS LAKE ABB WATERMASTER ELECTROMAGNETIC FLOW METERS

Closes 11/4/2026Opened 10/20/2026

Atlantic County Utilities Authority, NJ·New Jersey

60% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

South Coast Air Quality Management District·California

60% match

Meteorological Tower

Closes 11/4/2026Opened 10/2/2026