Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Water and Wastewater
  5. ›DRAWINGS 1 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB

City of Flint·Michigan

DRAWINGS 1 – WPC INFLUENT STRUCTURE & BATTERY A GRIT REHAB

Rolling / TBD close$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flint Water Pollution Control is preparing to rehabilitate its Influent Structure and Battery A Grit Facility. The scope covers demolition of existing concrete and metal components, extensive concrete repair and geopolymer coating, installation of new structural steel reinforcement, construction of temporary and permanent bulkheads, placement of bypass pumps capable of handling at least 40 MGD, and the integration of new slide‑gate assemblies with electric actuators. The project also includes pipe coating, flow‑meter installation, and compliance with multiple civil and structural codes. • Demolition of existing weir plates, overflow troughs, and masonry, followed by concrete removal and replacement. • Application of Sika geopolymer liner (≥ 1½″ thick) and concrete repair mortars, with hydrophilic waterstops at joints. • Installation of new reinforcing steel (ASTM A615 Grade 60) and stainless‑steel anchor bolts, plus structural steel per AISC/ANSI standards. • Construction of temporary bulkheads, permanent CMU bulkheads, and bypass pumping systems to maintain ≥ 40 MGD flow. • Fit‑out of slide‑gate assemblies (5′×5′ & 6′×6′) with Rotork electric actuators, new flow meters, and associated mechanical/electrical work.

Attached files

Contact

(810) 235-2555

Key dates

Opened
7/20/2022
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237310
Solicitation №
P20-578 DRAWINGS 1

Budget estimate

$2,000,000 – $5,000,000

Based on typical costs for large‑scale wastewater structure rehabilitation (demolition, concrete repair, specialized geopolymer coating, bulkhead and pump installation, and mechanical/electrical integration), a project of this magnitude in Michigan generally ranges from $2 million to $5 million. The estimate assumes a mid‑size facility, the need for high‑performance materials, and a schedule of several months to a year.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of San Clemente·California

Top match · 70%

WRP Grit Classifier Replacement Project

Closes 11/19/2026Opened 10/22/2026

Palm Beach County Water Utilities Department·Florida

68% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

Palm Beach County Water Utilities Department·Florida

67% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/16/2026

Palm Beach County Water Utilities Department·Florida

67% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/1/2026

City of Hollywood·Florida

67% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

66% match

82625B0045-BWT-BB-236 Replacement of the Cyclone Degritters and Grit Washers at the Bowery Bay WWTP

Closes 11/12/2026Opened 9/28/2026

Nevada Government·Nevada

66% match

SWRF Condition Assessment and Rehabilitation

Closes 11/5/2026Opened 10/13/2026

Cape Fear Public Utility Authority·North Carolina

65% match

BID RESULTS - Wrightsboro Elevated Water Tank Rehabilitation

Closes 11/27/2026Opened 9/23/2026

City of Eureka Springs·Arkansas

65% match

Construction of Eureka Springs Wastewater Treatment Plant Improvements

Closes 11/17/2026Opened 10/18/2026

City of Wilmington·Delaware

65% match

27019PW – Digester 4 Rehabilitation

Closes 11/17/2026Opened 9/22/2026

City of Rapid City·South Dakota

65% match

WRF Digester Exterior Coating and Insulation Replacement

Closes 11/10/2026Opened 10/24/2026

U.S. Department Of Defense·Kentucky

64% match

WH Ford RTC Fueling System Repairs

Closes 11/23/2026Opened 10/20/2026

U.S. Department Of Energy·California

64% match

Y--COTP Series Capacitor Two-Phase Design Build

Closes 11/13/2026Opened 10/20/2026

Massachusetts Town of Middleborough·Massachusetts

64% match

WPCF Secondary Clarifier Gate Replacement, Project#22054

Closes 11/19/2026Opened 10/23/2026

Jackson County Utility Authority·Mississippi

64% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

City of Charlotte·North Carolina

64% match

McAlpine Creek WRRF Digesters Rehabilitation

Rolling / TBD closeOpened 7/15/2027

U.S. Department Of Defense·Ohio

64% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

City of High Point·North Carolina

64% match

Bid 4008-111826 Repair of Final Clarifier #3 Westside WWTP

Closes 11/18/2026Opened 10/15/2026

Orange County Sanitation District, CA·California

64% match

J-124 (RFI), DIGESTER GAS FACILITIES REHABILITATION

Closes 11/15/2026Opened 8/25/2026

City of Charlotte·North Carolina

64% match

McDowell Creek WRRF Digesters Rehabilitation

Rolling / TBD closeOpened 7/11/2027

Colorado Department of Military and Veterans Affairs·Colorado

64% match

OAAA, 2010, 082411 Montrose Indoor Firing Range Lead Dust

Closes 12/2/2026Opened 10/28/2026

Gwinnett County Government·Georgia

64% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

U.S. Department Of Health And Human Services·California

64% match

Cooling Tower Refurbishment - Three (3) Cells

Closes 11/2/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

64% match

BATTERY POWER SUPPL

Closes 11/23/2026Opened 10/26/2026

Inland Empire Utilities Agency·California

64% match

Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements, Project No. RW15003.03

Closes 11/5/2026Opened 9/17/2026