Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›MODESTO JUNIOR COLLEGE: EAST CAMPUS- FLEET VEHICLE…

Yosemite Community College District·California

MODESTO JUNIOR COLLEGE: EAST CAMPUS- FLEET VEHICLE ELECTRIC CHARGERS

Closes 7/31/2026$150k – $200kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Yosemite Community College District seeks a qualified electrical contractor to install new electric‑vehicle (EV) charging infrastructure at Modesto Junior College’s East Campus. The scope includes adding a transformer, panelboard, and conduit/trenching to serve two dual‑port EV chargers, with built‑in capacity for three additional dual‑port and one single‑port charger in the future. Work must comply with California prevailing‑wage rules, DIR registration, and a 70‑day performance period, with liquidated damages of $500 per day for delays. • Install a new dry‑type transformer, panelboard, and switchboard, plus conduit and wiring for two dual‑port EV chargers. • Provide civil works: trenching, concrete pads, grading, and paving repairs, with provisions for future charger expansion. • Deliver complete testing, commissioning, O&M manuals, as‑built drawings, and a one‑year workmanship warranty.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Saul Guzman(Purchasing Contact)

[email protected]

(209) 575-6963

Key dates

Opened
6/30/2026
Questions due
7/23/2026
Pre-bid meeting
7/14/2026
Site visit
7/14/2026
Closes
7/31/2026
Duration
70 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
27-1985

Budget estimate

$150,000 – $200,000

The engineering estimate lists the project at $175,000. Assuming a typical contractor margin of 10‑15% and accounting for bonding, insurance, and warranty costs, the net earnings for the prime contractor would likely fall between $150,000 and $200,000. This range reflects the value of the electrical installation work, civil site work, testing, and documentation required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Michigan Lansing School District·Michigan

Top match · 67%

SO-1862 Electrical Infrastructure/install chargers/bess

Closes 11/12/2026Opened 10/19/2026

City of Cincinnati·Ohio

66% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/16/2026

NYS Rockland County·New York

66% match

ELECTRIC VEHICLE CHARGING INFRASTRUCTURE STUDY

Closes 11/6/2026Opened 9/22/2026

Northeast Wisconsin Technical College·Wisconsin

66% match

Green Bay Campus Rooftop Solar

Closes 11/3/2026Opened 10/12/2026

Massachusetts Department of Transportation·Massachusetts

66% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

Massachusetts Department of Energy Resources·Massachusetts

66% match

DOER PON-ENE-2027-001 LBE Clean Energy Grants for State Entities Fleet EVSE Deployment 4.0

Closes 6/30/2027Opened 8/20/2026

City of Cincinnati·Ohio

65% match

EV Charging Rec Centers PID 122816

Closes 11/6/2026Opened 10/19/2026

Connecticut Energy & Environmental Protection·Connecticut

65% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

SC Department of Education·South Carolina

65% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

City of Cincinnati·Ohio

64% match

EV Charging Rec Centers PID 122816

Closes 11/13/2026Opened 10/16/2026

City of Tamarac·Florida

64% match

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

SC Department of Education·South Carolina

64% match

Electric Bus Charging Stations - Union - Electrical

Closes 11/5/2026Opened 10/13/2026

South Coast Air Quality Management District·California

64% match

Clean Heavy Duty Vehicle Incentive Program Battery Electric Freight Vehicles for Classes 6 and 7

Closes 1/15/2027Opened 10/7/2026

California Department of State Hospitals·California

64% match

IFB 26-42015-000 Electric Vehicle Charging Stations Maintenance and Repair Services

Closes 11/6/2026Opened 10/21/2026

City of Long Beach·California

64% match

R-7282 Fleet Services EV Charging Depot

Closes 11/20/2026Opened 10/14/2026

Jacksonville State University·Alabama

64% match

- SUV – EV Police Pursuit Vehicle

Closes 11/13/2026Opened 10/23/2026

City of Cincinnati – Department of Transportation (DOTE)·Ohio

64% match

EV Charging Rec Centers PID 122816

Closes 11/13/2026Opened 10/27/2026

Department of Education·South Carolina

64% match

Electric Bus Charging Stations - Colleton - Paving

Closes 11/10/2026Opened 10/19/2026

California Energy Commission·California

64% match

GFO-25-603 - California’s National Electric Vehicle Infrastructure Formula Program – Solicitation 6 Community Charging

Closes 11/20/2026Opened 2/23/2026

City of Hartford·Connecticut

64% match

On Call Electric Vehicle (EV) Consultant Services

Closes 11/19/2026Opened 10/26/2026

SC Department of Education·South Carolina

64% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

Sweetwater Union High School District·California

63% match

District-Wide Uninterrupted Power Supply (UPS) Battery Replacement

Closes 11/10/2026Opened 10/9/2026

Port of Stockton·California

63% match

EPA Customer Side Design & Engineering

Closes 11/12/2026Opened 10/8/2026

Wyoming Department of Transportation·Wyoming

63% match

NATIONAL ELECTRIC VEHICLE INFASTRUCTURE PROGRAM

Closes 11/18/2026Opened 9/23/2026

Maryland Department Of General Services·Maryland

63% match

Installing 10 Single-Port 48A Level 2 and 2 Level 3 80 kW DC Fast Chargers at Maryland Correctional Transportation Unit

Closes 11/9/2026Opened 10/17/2026