Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Civil Engineering
  5. ›ALBERTINI WTF SYSTEM IMPROVEMENTS, MANSFIELD, MA

Town of Groton·Connecticut

ALBERTINI WTF SYSTEM IMPROVEMENTS, MANSFIELD, MA

Closes 1/13/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The scope of work includes the construction of a new 3,500 square foot PFAS treatment building at 1675 West St. Mansfield, MA. The new building is a free-standing steel prefabricated building that will be used to treat PFAS, set 150’ from the existing building. Installation of three (3) trains of two (2) 12-feet diameter activated carbon filter vessels are to be pre-purchased and supplied by the Owner. All other process equipment, including controls, will be provided and installed by the Contractor, as well as building construction, including electrical, plumbing, and HVAC. The site preparation, including clearing and excavation, will be performed by the Owner ahead of the Contract Award. Any additional site work needed will be completed by the Contractor. The building will have a bathroom connected to the existing septic system. The Contractor will demo the existing motor control center and install a new motor control center for the existing WTF at Albertini, as well as at the Mahana Well Site Building, supporting Wells #6 and #10. MCC’s with integral VFDs and Switchgear will be pre-purchased and supplied by the Owner, installed by the Contractor. The two (2) new generators will be pre-purchased and supplied by the Owner and installed by the Contractor at the Albertini WTF and Mahana Well Site. The existing Albertini WTF improvements include modifications of treated water process piping and connections to the PFAS treatment, replacement of chem feed systems, bulk storage tanks, transfer pumps and chem dosing packages, green sand system improvements, surface prep and painting of walls, flooring, and process piping, new ceiling tiles, HVAC improvements, and roof improvements. Well improvements at Albertini include the replacement of Well #4. Well drilling and test will be completed by the Owner ahead of Construction award. Contractor will be responsible for connection to existing main and electrical service and improvements to existing well vault. Well #2 and #3 at Albertini will be upgraded by the Contractor with new pumps and devices. At 311 Plain Street, the Mahana site, the Contractor will upgrade Well #6 and #10 including, new pumps, new electrical, and new devices.* A non-mandatory Prebid Conference will be held on December 10, 2025 at the Albertini Water Treatment Facility (1675 West Street, Mansfield, MA 02048). Any request for interpretation of plans and specifications may be submitted in writing at that time. Bidders will have an opportunity to view the site of the work following the Prebid Conference. All general contractors and subcontractors are encouraged to attend.* This project is subject to the American Iron and Steel Requirements of P.L. 113-76, the Consolidated Appropriations Act of 2014. See Section 30 for waiver information.* This project is subject to the Build American, Buy America (BABA) and American Iron and Steel (AIS) requirements. Steel, iron, manufactured products, non-ferrous metals, plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables), glass (including optic glass), lumber, and drywall are subject to BABA requirements. All products that fall under AIS and BABA must be identified and have certification documents provided.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
11/20/2025
Closes
1/13/2026

Last updated

Details

Industry
Civil Engineering
NAICS
221310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Town of Amherst·Massachusetts

Top match · 62%

27-016 Munson Library Electrical System Upgrade

Closes 11/12/2026Opened 10/28/2026

Massachusetts Convention Center Authority·Massachusetts

60% match

V04 - MCEC LOD Utilities Upgrade

Closes 11/12/2026Opened 10/14/2026

Massachusetts City of Brockton·Massachusetts

60% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

Town of Mansfield·Connecticut

60% match

Bid Tabulation - Cafeteria Acoustic Improvements

Rolling / TBD closeOpened 1/29/2025

City of Litchfield·Illinois

59% match

Water Distribution Improvements Phases 1 & 2 - Litchfield, IL

Closes 11/5/2026Opened 10/2/2026

Mansfield Housing Authority·Massachusetts

59% match

Courtyard Renovation: Doors, Storms, Painting & Railing Replacement

Closes 11/4/2026Opened 8/26/2026

Town of Medfield·Massachusetts

59% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

Massachusetts Metropolitan Area Planning Council·Massachusetts

59% match

CRHSAC24 Worcester Area Interoperability System Upgrades

Closes 11/10/2026Opened 10/26/2026

Massachusetts Convention Center Authority·Massachusetts

59% match

V04 - Lawn on D Utilities Upgrades

Closes 11/12/2026Opened 10/14/2026

Massachusetts City of Springfield·Massachusetts

59% match

27-065: Improvements to Clarendon Street Fountain

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of The Interior·Oregon

59% match

T--NHOTIC AV SYSTEM REPLACEMENT

Closes 11/20/2026Opened 10/7/2026

Massachusetts Town of Hatfield·Massachusetts

59% match

Hatfield Farm Museum Renovations

Closes 11/18/2026Opened 10/14/2026

Massachusetts Town of Marion·Massachusetts

59% match

Creek Road Pump Station Resiliency Improvements

Closes 12/2/2026Opened 10/21/2026

City of Boston·Massachusetts

59% match

Age Strong Transportation Program Consultant

Closes 11/9/2026Opened 10/12/2026

Power Authority of New York·New York

59% match

LAN CONNECTIVITY EXPANSION

Closes 11/9/2026Opened 10/19/2026

Massachusetts Department of Transportation·Massachusetts

59% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

City of Lowell·Massachusetts

59% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

Springfield·Massachusetts

59% match

27-065 - Improvements to Clarendon Street Fountain

Closes 11/18/2026Opened 10/29/2026

Dedham Housing Authority·Massachusetts

59% match

Unit Renovation

Closes 11/10/2026Opened 10/21/2026

City of Clovis·California

59% match

Adaptive Signalization

Closes 11/17/2026Opened 10/22/2026

Amherst Housing Authority·Massachusetts

58% match

Fire Alarm System Upgrade

Closes 11/6/2026Opened 10/16/2026

City of Belle Isle·Florida

58% match

Modernizing The Audiovisual System for the Council Chambers

Closes 11/5/2026Opened 10/1/2026

Wayne Township·New Jersey

58% match

Engineering Services for the Community Center HVAC Upgrades

Closes 11/12/2026Opened 8/31/2026

Hastings Utilities·Nebraska

58% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Keene·New Hampshire

58% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026