Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Construction
  5. ›Construction Manager at Risk w/ GMP for INNOVATION &…

Maryland Frederick Community College·Maryland

Construction Manager at Risk w/ GMP for INNOVATION & TECHNOLOGY CENTER Catoctin Hall Addition/Renovation

Closes 3/10/2026$1.5M – $2.5MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Frederick Community College is seeking a qualified firm to act as Construction Manager at Risk (CMaR) with a Guaranteed Maximum Price (GMP) for the Innovation & Technology Center project at Catoctin Hall. The scope includes designing and constructing a 28,352‑square‑foot addition and renovating 30,245 sq ft of existing space to create a 79,695 sq ft facility featuring labs, classrooms, collaboration zones, a simulated clean room, and an Innovation Center. The project will target LEED Silver certification and follows a partnering approach that integrates the college, architect, CMaR, and trade contractors. • Provide full CMaR services (design coordination, cost estimating, schedule management, construction oversight) under a GMP. • Deliver a modern, sustainable facility supporting science, biotech, computing, business, and technology programs. • Manage construction of new addition, extensive interior renovations, and specialized spaces (clean‑room simulation, labs, collaborative areas). • Coordinate with a separately contracted architectural/engineering firm and ensure LEED Silver compliance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kamaria Jackson(Procurement Officer / Buyer)

[email protected]

Key dates

Opened
2/11/2026
Pre-bid meeting
2/17/2026
Site visit
2/17/2026
Closes
3/10/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
BPM055342

Budget estimate

$1,500,000 – $2,500,000

The solicitation is classified as a “H – Over $15,000,000” project, indicating total construction costs exceed $15 M. A typical Construction Manager at Risk fee ranges from 8‑12 % of the GMP, plus reimbursable expenses. Assuming a $15‑$20 M GMP, the contractor’s net earnings would likely fall between $1.2 M and $2.4 M. Therefore, a reasonable estimate for the firm’s budget is roughly $1.5 M‑$2.5 M, depending on final GMP, change orders, and fee structure.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Manalapan·Florida

Top match · 73%

Construction Manager at Risk

Closes 11/5/2026Opened 10/6/2026

Florida Department of Agriculture and Consumer Services (FDACS)·Florida

72% match

BRONSON ANIMAL DISEASE DIAGNOSTIC LABORATORY BLDG 1000 EXPANSION - Construction Management Services

Closes 11/20/2026Opened 10/16/2026

Palm Beach County Board of County Commissioners·Florida

71% match

CM@ Risk Services - North County Courthouse Renovations

Closes 11/17/2026Opened 10/2/2026

Vantage Group - Boston Logan Terminal C Redevelopment·Massachusetts

71% match

Construction Management at Risk Services for Logan Terminal C Redevelopment

Closes 11/6/2026Opened 10/21/2026

City and County of Denver·Colorado

71% match

RFP: Boettcher Concert Hall Renovation CM/GC

Closes 12/2/2026Opened 10/22/2026

Maryland-National Capital Park and Planning Commission·Maryland

71% match

Construction Manager at Risk (CMAR) Services Historic Concord Manor – Preservation, Rehabilitation, and Infrastructure Improvements

Closes 11/17/2026Opened 9/21/2026

Richland School District Two·South Carolina

71% match

Construction Management At-Risk (CMAR) Services for a Welcome Center and Community Hub

Closes 11/17/2026Opened 10/22/2026

Lexington County School District One·South Carolina

71% match

Construction Manager at Risk Services Maintenance Capital Program Group 3

Closes 11/2/2026Opened 10/2/2026

The University of Texas Health Science Center at Houston (UTHealth Houston)·Texas

71% match

Reuel A. Stallones Rehabilitation and Repair (CMAR Services)

Closes 12/4/2026Opened 10/28/2026

Georgia Macon Water Authority·Georgia

70% match

Site 3 951 5th St. Maintenance Office Expansion

Closes 11/25/2026Opened 10/28/2026

University of Louisville·Kentucky

70% match

Fresh Tissue Lab Renovation | CM/GC

Closes 11/3/2026Opened 10/9/2026

Southwest ISD·Texas

70% match

Construction Manager-At-Risk (CMR) - Building 800 HVAC Replacement Project

Closes 11/17/2026Opened 10/26/2026

North Carolina School of Science and Mathematics·North Carolina

70% match

NC School of Science and Math

Closes 11/17/2026Opened 10/26/2026

City of New London·Connecticut

70% match

Construction Manager-at-Risk for the Water Street Parking Garage Expansion Project

Closes 12/1/2026Opened 10/28/2026

Lexington County School District One·South Carolina

70% match

Construction Manager at Risk Services Maintenance Capital Program Group 2

Closes 11/2/2026Opened 10/2/2026

Massachusetts Port Authority (Massport)·Massachusetts

70% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Greater Orlando Aviation Authority·Florida

70% match

Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517)

Closes 11/9/2026Opened 9/28/2026

Lexington County School District One·South Carolina

69% match

Construction Manager at Risk Services Maintenance Capital Program Group 1

Closes 11/2/2026Opened 10/2/2026

City of Meriden·Connecticut

69% match

RFQ-P027-32 New Pulaski School Construction Manager at Risk

Closes 11/19/2026Opened 10/22/2026

North Carolina NC School of Science and Math·North Carolina

69% match

NC School of Science and Math

Closes 11/17/2026Opened 10/26/2026

Arizona State University·Arizona

69% match

CMAR 106232 ECG Renovations

Closes 11/19/2026Opened 10/22/2026

Iowa Central Community College·Iowa

69% match

Notice of Intent to Enter into a Guaranteed Maximum Price Contract

Rolling / TBD closeOpened 4/20/2026

Connecticut City of New London·Connecticut

69% match

Construction Manager-at-Risk for the Water Street Parking Garage Expansion

Closes 12/1/2026Opened 10/28/2026

Massachusetts City of Springfield·Massachusetts

69% match

27-058 Construction Management at Risk Services, German Gerena Community School �¢���� Prequal

Closes 11/10/2026Opened 10/15/2026