Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Iowa
  4. ›Water and Wastewater
  5. ›Tama Brine Building Water Line Extension.

Iowa Department of Transportation·Iowa

Tama Brine Building Water Line Extension.

Closes 6/24/2026$250k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Iowa DOT is seeking competitive bids to install a new 6‑inch water main and associated infrastructure linking the City of Tama water system to the DOT Maintenance Garage’s brine building, with an optional HDPE alternate line. The contractor will provide all labor, materials (except shut‑off valves and fire hydrants supplied by the City), and must meet City of Tama specifications, perform under DOT supervision, and complete work within a three‑month window. • Install 6‑inch ductile‑iron water main from City of Tama system to DOT Maintenance Garage, including boring under Business Highway 30 and conventional excavation. • Install physical shut‑off valves, fire hydrants, new water meters, and interior shut‑off valve at the brine building; City supplies valves/hydrants, contractor installs. • Optional alternate: install 6‑inch HDPE line from a stub at the brine building service to the Maintenance Garage. • All work must comply with Iowa Administrative Code 761‑20, be coordinated with DOT inspection schedule, and finish by October 1 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Teri Schulz(Purchasing Agent)

[email protected]

(515) 239-1431

Key dates

Opened
6/3/2026
Closes
6/24/2026
Duration
3 months

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
645-DOTRFB-2812-2026

Budget estimate

$250,000 – $500,000

No contract value is disclosed. Based on regional rates for 6‑inch ductile‑iron water main installation (approximately $150‑$300 per linear foot) plus valves, hydrants, meters, labor, and the optional HDPE alternate, a rough estimate for a 1,200‑ft main could range from $250,000 to $500,000. The lower bound assumes minimal ancillary work; the upper bound includes the alternate HDPE line, higher labor rates, and contingency.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Inland Empire Utilities Agency·California

Top match · 68%

Brine Line Master Service

Closes 11/5/2026Opened 10/5/2026

Catawba Regional Council of Governments·South Carolina

68% match

Shannon Street Waterline Project

Closes 11/5/2026Opened 9/30/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Salina·Kansas

67% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

U.S. Department Of Defense·California

67% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

City of Columbus Ohio·Ohio

66% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

City of Columbus Ohio·Ohio

66% match

OSU Innovation District Waterline Extension

Closes 11/18/2026Opened 10/26/2026

U.S. Department Of The Interior·California

66% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Agriculture·Wyoming

66% match

4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming

Closes 11/17/2026Opened 9/30/2026

The City of Columbus·Ohio

66% match

RFQ033929 - OSU Innovation District Waterline Extension 690236-100174

Closes 11/18/2026Opened 10/26/2026

Florida Governmental Utility Authority·Florida

66% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

CPPJ- Special Service Districts·Louisiana

66% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

City of Muskogee·Oklahoma

65% match

Bid Opening - SH 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

City of Lavaca·Arkansas

65% match

West Birch Street Water System Improvements

Closes 11/5/2026Opened 10/11/2026

Bristol Virginia Utilities Authority·Virginia

65% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

NYS Alden, Town of·New York

65% match

Townline Water District

Closes 11/4/2026Opened 10/9/2026

City of Salina·Kansas

65% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 7/31/2026

City of Salina·Kansas

65% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/3/2026

Citrus County - Board of County Commissioners·Florida

65% match

ITB 26-196 Southwest Regional Water Reclamation Facility (SWRWRF) - Reclaimed Water System

Closes 11/24/2026Opened 10/17/2026

City of Farmers Branch·Texas

65% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

City of El Paso De Robles·California

65% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

Mississippi

64% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

City of Muskogee·Oklahoma

64% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

City of Salina·Kansas

64% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/6/2026

Eastern Municipal Water District·California

64% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026