Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›Brooklyn Bridge Park Pier 1 Pavilion Stair Replacement

NYC Brooklyn Bridge Park Corporation·New York

Brooklyn Bridge Park Pier 1 Pavilion Stair Replacement

Closes 10/5/2026$300k – $800kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Brooklyn Bridge Park (BBP) is seeking a qualified general contractor to replace three stair sets at the Pier 1 Pavilion. The work includes demolishing existing concrete stairs, salvaging and reinstalling eleven hand‑rail sections, inspecting and repairing rebar as needed, installing new formwork, pouring new concrete stairs that meet NYC Building Code §1011.5.4, and providing pre‑pour and final as‑built elevation surveys. The contractor must protect the surrounding park environment, maintain pavilion operations, manage limited vehicle access with flaggers, and submit detailed logistics, means‑and‑methods, and M/WBE utilization plans. The contract is anticipated to last about two months, with a maximum contract price to be proposed by bidders and a mandatory 30 % M/WBE participation goal. • Demolition, re‑bar inspection/repair, formwork, concrete pour, and hand‑rail re‑installation – one stair at a time. • Required site‑protection measures (8‑ft chain‑link fence, plant‑bed protection) and coordination with BBP‑provided water and a BBP‑retained special concrete inspector. • Mandatory submission of detailed cost schedule (Exhibit 2A), PE‑stamped drawings, and M/WBE utilization plan; proposal deadline 5 Oct 2026.

Attached files

Contact

John Zhang(Contact Person)

[email protected]

(000) 000‑0000

Key dates

Opened
9/15/2026
Questions due
9/24/2026
Site visit
9/21/2026
Closes
10/5/2026
Projected award
10/1/2026
Duration
2 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
20260909003

Budget estimate

$300,000 – $800,000

No contract dollar amount is disclosed, but a full stair‑replacement in a high‑profile NYC park typically ranges from $300 k to $800 k depending on concrete volume, site‑logistics, hand‑rail salvage, and M/WBE subcontracting requirements. Factors influencing the final price include the condition of existing rebar, the need for waterproofing, the cost of temporary fencing and traffic control, and the premium for meeting NYC prevailing‑wage and union rules.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Port of Portland·Oregon

Top match · 66%

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

New York City Department of Parks and Recreation·New York

65% match

RECONSTRUCTION OF JESSE OWENS PLAYGROUND AND MINI POOL

Rolling / TBD closeOpened 3/17/2016

Connecticut Town of Brookfield·Connecticut

65% match

Replace Stadium Staircase

Closes 11/12/2026Opened 10/16/2026

Montana

65% match

B26002 - Pheasant Home Stair Railing Replacement

Closes 11/20/2026Opened 7/31/2026

New York City Department of Transportation·New York

64% match

BID EXTENSION: COMPONENT REHABILITATION OF 8 BRIDGES IN THE BOROUGH OF BROOKLYN

Rolling / TBD closeOpened 4/3/2020

New York City Department of Transportation·New York

64% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

Nyc Department of Design and Construction·New York

64% match

85027B0026 - HWCB27KR : REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

U.S. Department Of The Interior·Minnesota

63% match

Y--MN FERGUS FALLS WMD HANDRAIL STAIRS

Closes 11/13/2026Opened 10/27/2026

City of St. Petersburg·Florida

63% match

Skate Park Obstacle, Demolition/Replacement

Closes 11/12/2026Opened 10/26/2026

Mansfield Housing Authority·Massachusetts

63% match

Courtyard Renovation: Doors, Storms, Painting & Railing Replacement

Closes 11/4/2026Opened 8/26/2026

City of Long Beach·California

63% match

Jib Crane Replacement

Closes 11/19/2026Opened 9/23/2026

City of Long Beach·California

63% match

R-7307 Alamitos Bay Berth 1 And 2 Dock Replacement

Closes 11/19/2026Opened 10/8/2026

City of Treasure Island·Florida

63% match

Bascule Bridge HVAC Unit Replacement

Closes 11/18/2026Opened 10/28/2026

New York City Department of Environmental Protection·New York

63% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

Delaware River Joint Toll Bridge Commission·New Jersey

62% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of St. Louis Board of Public Service·Missouri

62% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

City of Charlotte·North Carolina

62% match

Morris Field Bridge Replacement

Rolling / TBD closeOpened 5/1/2026

Georgia City of Chattahoochee Hills·Georgia

62% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026

City of New York Department of Parks & Recreation·New York

62% match

MG-40550-117MA Mannahatta Park Recon

Closes 11/5/2026Opened 10/27/2026

New York City Department of Design and Construction·New York

62% match

HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

U.S. Department Of Justice·New York

62% match

MDC BROOKLYN - REMOVE AND REPLACE SHOWER PARTITIONS

Closes 11/13/2026Opened 10/20/2026

MTA - NYC Transit (NYCT)·New York

62% match

Brooklyn Vent Building and Governors Island Vent Building Facade Repairs and Roof Rehabilitation at the Hugh L. Carey Tunnel

Closes 12/1/2026Opened 10/27/2026

City of Melbourne·Florida

62% match

Front Street Boat Dock Repair and Replacement

Closes 11/17/2026Opened 10/9/2026

LA Public Works Engineering Bureau·California

62% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

City of Sandy·Utah

62% match

CITY HALL WEST STAIR REPLACEMENT, ADA RAMP & WEST/NORTH LANDSCAPE REDESIGN

Closes 11/6/2026Opened 10/23/2026