The State of Montana, through Montana State University’s University Facilities Management, is seeking a qualified design‑build contractor to replace the existing HVAC system in the Miller Dining Auxiliaries Offices. The work includes selective demolition of the current VRF system, installation of eight water‑source heat pumps with auxiliary heating, new ductwork, associated mechanical controls, BACnet‑enabled DDC integration, required electrical upgrades, seismic bracing, freeze‑protection glycol loops, and full testing, balancing, and commissioning. The contractor must also provide all required bonds, insurance, prevailing‑wage compliance, and adhere to a substantial‑completion deadline of 30 Sept 2026.
• Demolition of existing HVAC and related electrical components.
• Installation of eight Climate Master water‑to‑air heat pumps (R‑454B) with controls, valves, and BAS integration.
• New metal ductwork (OMNI Duct), dampers (Greenheck, Ruskin), and associated insulation and sound‑lining.
• Complete electrical work: power distribution, VFDs, conduit, panel modifications, and low‑voltage control wiring.
• Testing & balancing, as‑built documentation, O&M manuals, and warranty submission.