The project involves a comprehensive interior renovation and fit‑out of approximately 2,520 sq ft on the 4th floor of the Carol M. Newman Library to create a virtual‑studio suite. Work includes demolition of existing finishes, structural modifications, installation of new HVAC, electrical, fire‑sprinkler, and low‑voltage systems, construction of partition walls, acoustic ceiling systems, flooring, and interior finishes, as well as testing and commissioning. The contractor must comply with Virginia Tech’s design standards, handle asbestos per the attached report, and meet all applicable Virginia building codes.
• Demolition and removal of existing interior finishes, followed by construction of a 2,520 sf studio suite with offices, control rooms, and production spaces.
• Installation of new HVAC (blower‑coil units, ductwork, controls), electrical (panelboards, lighting, data/telecom, fire‑alarm), and fire‑sprinkler systems, adhering to NEC, NFPA 13/72, and Virginia codes.
• Finish work including metal‑stud walls with sound‑attenuation, acoustic ceiling tiles, carpet, painting, and coordination of all trades; includes testing, balancing, and a one‑year warranty on workmanship and equipment.