Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Indiana guideIndiana Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Indiana
  4. ›Environmental Services
  5. ›Clear Creek Corridor Renewal Project

City of Bloomington·Indiana

Clear Creek Corridor Renewal Project

Closes 12/19/2025$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Bloomington Utilities is seeking a professional engineering consulting firm to provide engineering services for open channel drainage improvements for the Clear Creek Corridor Renewal Project. The project aims to convert the 100-year old limestone block open channel into a more naturalized stream channel with water quality treatment amenities. The selected consultant will be responsible for tasks including comprehensive drainage design, surveying, geotechnical analysis, hydrologic and hydraulic analysis, public outreach, acquiring all applicable permits, contract documents, and construction cost estimates. The scope of services includes permitting, civil/site engineering, and landscaping. • The project will consist of a study phase, design phase, and construction phase. • The study phase will include the development of three technically feasible alternatives to reduce the regulatory floodplain and provide innovative stormwater treatment technologies. • The design phase will include the creation of a hydrology and hydraulics model to map the 1% Annual Exceedance Probability (AEP) floodplain for Clear Creek. • The selected consultant must be experienced in the CLOMR/LOMR process and have a design philosophy that integrates natural infrastructure and sustainability.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelsey Thetonia(Assistant Director - Environmental)

[email protected]

(812) 349-3656

Key dates

Opened
11/14/2025
Questions due
12/5/2025
Closes
12/19/2025

Last updated

Details

Type
Request for Qualification
Industry
Environmental Services
NAICS
541620

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of services and the complexity of the project. Considering the project involves feasibility study, preliminary engineering design, and land acquisition, the budget may range from $500,000 to $2,000,000. This estimate is based on the assumption that the project will require significant engineering and consulting services, as well as potential land acquisition costs. Factors that may influence the likely payment range include the size and complexity of the project, the number of phases involved, and the level of expertise required from the selected consultant.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Shawnee·Kansas

Top match · 69%

Ordinance No. 3519

Closes 4/1/2030Opened 4/1/2025

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

68% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of Charlotte·North Carolina

67% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

66% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

City of El Cajon·California

66% match

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026Opened 10/14/2026

Cobb County·Georgia

66% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

66% match

DGS 142‑6 PH 1 Park Improvements & DGS 142‑7 PH 1 Stream Corridor Restorations – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

City of Fitchburg·Wisconsin

65% match

Yarmouth Greenway Streambank Restoration

Closes 11/10/2026Opened 10/29/2026

Clean River Partners·Minnesota

65% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

Berkeley County·South Carolina

65% match

Paslay Drive Right-Of-Way Improvements

Closes 11/30/2026Opened 10/27/2026

City of Gaithersburg·Maryland

65% match

Construction Services for Rabbitt Road Stream and Vegetative Buffer Restoration

Closes 11/9/2026Opened 9/15/2026

NYS Cambria, Town of·New York

65% match

Baer Road Culvert Over East Branch of Twelve Mile Creek

Closes 11/5/2026Opened 10/9/2026

City of Clearwater·Florida

65% match

Lower Spring Branch Stormwater Improvements

Closes 12/9/2026Opened 9/30/2026

City of Colorado Springs·Colorado

65% match

Cottonwood Creek Stabilization Academy to Union

Closes 11/9/2026Opened 10/9/2026

City of Charleston, WV·Virginia

65% match

Capital Connector Construction Project

Closes 12/3/2026Opened 10/5/2026

City of Shawnee·Kansas

64% match

Ordinance No. 3523

Closes 6/3/2033Opened 6/3/2025

City of Anderson·South Carolina

64% match

Branchcliff Lane Streambank Stabilization

Closes 11/2/2026Opened 10/12/2026

U.S. Department Of Transportation·Idaho

64% match

ID ERFO FS 2022-1(1), Nez Perce-Clearwater Repairs 2022-1

Closes 10/7/2028Opened 10/7/2026

City of Cleveland·Ohio

64% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

City of Charlotte·North Carolina

64% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

North Carolina County of Mecklenburg·North Carolina

64% match

Kings Branch at Arrowood Road Phase 2B Stream Restoration

Closes 11/5/2026Opened 10/9/2026

City of Austin·Texas

64% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

City of Creve Coeur·Missouri

64% match

Malcolm Terrace Park Bridge and Deer Creek Stabilization

Closes 11/12/2026Opened 10/22/2026

City of Goshen, Indiana·Indiana

64% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

U.S. Department Of Transportation·Mississippi

64% match

Natchez Trace Parkway Project MS NP NATR 3F26

Closes 11/10/2026Opened 10/8/2026