The Alaska Energy Authority is seeking a qualified contractor to fully renovate the existing Manokotak Power Plant. The work includes demolition, civil site work, installation of owner‑furnished generators, switchgear, heat‑recovery equipment, fuel‑oil and glycol piping, electrical upgrades, fire‑alarm and fire‑suppression systems, and comprehensive testing, commissioning, and documentation. The contract is a lump‑sum base‑bid with additive alternates for fire‑alarm, fire‑suppression, and exterior tank painting, and requires extensive Buy‑America and Davis‑Bacon compliance.
• Full plant renovation: structural demolition, grading, utility trenching, and building upgrades.
• Mechanical & electrical scope: three 350 kW generators, heat‑recovery system, fuel‑oil and glycol distribution, 480 V power distribution, and fire‑protection systems.
• Mandatory deliverables: QA/QC plan, As‑Built drawings, O&M manuals, performance testing, and all required certifications and bonds.