Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Energy and Utilities
  5. ›Comprehensive Assessment of the Broadwater Dam

Montana Department of Natural Resources and Conservation (DNRC)·Montana

Comprehensive Assessment of the Broadwater Dam

Closes 11/14/2025$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Montana Department of Natural Resources and Conservation (DNRC) seeks qualifications from firms to provide Independent Consultant services for the upcoming Part 12D Comprehensive Assessment (CA) of the Broadwater Hydroelectric Project. The selected Independent Consultant (IC) Team will perform tasks including submitting a Part 12D Inspection Plan, conducting a physical field inspection, performing a Potential Failure Modes Analysis (PFMA) and a Level 2 Risk Analysis (L2RA), and submitting a Comprehensive Assessment Report (CAR). The project involves a 9.66 MW run-of-river hydroelectric facility located on the Missouri River near Toston, Montana. Key services include: • Part 12D Inspection Plan submission • Physical field inspection • PFMA and L2RA • Comprehensive Assessment Report submission • CA Review Meeting presentation The IC Team must have experience with Part 12D Comprehensive Assessments, PFMA, and L2RA, and must demonstrate qualifications under 18 CFR § 12.31(a).

Attached files

Contact

Bryant Gauthier(Procurement Officer)

[email protected]

(406) 444-6743

Key dates

Opened
10/2/2025
Questions due
10/27/2025
Closes
11/14/2025
Duration
5 years

Last updated

Details

Type
Request for Qualification
Industry
Energy and Utilities
NAICS
541330
Solicitation №
DNRC-RFQ-2026-1211BG

Budget estimate

$500,000 – $2,000,000

The budget for this project is difficult to estimate without more information on the scope and complexity of the work. However, based on the services required, including the submission of a Part 12D Inspection Plan, physical field inspection, PFMA, L2RA, and Comprehensive Assessment Report, the budget could range from $500,000 to $2 million. This estimate is influenced by the fact that the project involves a comprehensive assessment of a hydroelectric facility, which may require significant resources and expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of South Lake Tahoe·California

Top match · 65%

Drainage Master Plan Update & Areawide Facility Analyses

Closes 11/17/2026Opened 10/1/2026

City of Seattle·Washington

64% match

Outreach Event: Cascades Dam Tour

Closes 2/26/2027Opened 9/30/2026

Michigan Department of Technology, Management & Budget (DTMB)·Michigan

64% match

472/26613.TAP; Boston Pond - Dam Study

Closes 11/19/2026Opened 10/29/2026

Massachusetts Mohawk Trail Hawlemont Regional School District·Massachusetts

63% match

Comprehensive Property Condition Assessment and Long-Range Capital Planning Analysis

Closes 11/2/2026Opened 10/19/2026

North Central Missouri Regional Water Commission·Missouri

63% match

REBID NCMRWC Roy Blunt Multi-Purpose Reservoir

Closes 11/5/2026Opened 10/15/2026

Western Virginia Water Authority·Virginia

63% match

ITB - SPRING HOLLOW WTF CLEARWELL

Closes 11/17/2026Opened 10/15/2026

Ohio Department of Natural Resources·Ohio

63% match

Lake Logan Dam Improvements

Closes 11/6/2026Opened 10/16/2026

Laramie Rivers Conservation District·Wyoming

63% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

City of Salisbury·Maryland

63% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

62% match

DGS 142‑8, PH 1 – Dam Removal – Ryerson Station State Park

Closes 11/12/2026Opened 10/14/2026

State of Michigan – Department of Technology, Management and Budget (DTMB), State Facilities Administration, Design and Construction Division·Michigan

62% match

751/26612.MAA; Various Dams - Engineering Studies

Closes 12/3/2026Opened 10/22/2026

U.S. Department Of Defense·Kentucky

62% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

City of Gilroy·California

62% match

Comprehensive Facilities Condition Assessment

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·Oklahoma

62% match

Construct New Bulkhead at Hugo Lake

Closes 12/23/2026Opened 12/23/2025

Alaska Department of Environmental Conservation·Alaska

62% match

University of Alaska Southeast Water Line Improvements Categorical Exclusion Determination

Rolling / TBD closeOpened 10/9/2026

City of Clearwater·Florida

62% match

Seminole Boat Ramp

Closes 11/18/2026Opened 10/7/2026

California Grants·California

62% match

Dam Safety and Climate Resilience Local Assistance

Rolling / TBD closeOpened 5/19/2026

City of Farmington·New Mexico

62% match

Civitan Park Pond Outlet Structure and Conduit Replacement

Closes 11/19/2026Opened 10/21/2026

Town of Bridgton·Maine

61% match

RFPs Requested – Willett Road Engineering Study

Closes 11/19/2026Opened 10/20/2026

Massachusetts Town of Bolton·Massachusetts

61% match

Earthen Dam Restoration at Bowers Spring Conservation Area

Closes 11/17/2026Opened 10/13/2026

City of North Charleston·South Carolina

61% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

Ohio Department of Natural Resources·Ohio

61% match

Cowan Lake Dam Improvements

Closes 11/6/2026Opened 10/2/2026

Covington Municipality·Rhode Island

61% match

088-26-GREEN INFRASTUCTURE STORMWATER PROJECT DESIGN

Closes 11/2/2026Opened 11/2/2026

Maryland Mayor and Town Council of Oakland·Maryland

61% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

Commonwealth of Kentucky·Kentucky

61% match

RFB-105-27 Big Bone Lake Dam Decommissioning

Closes 12/2/2026Opened 10/27/2026