This project entails the design, fabrication, and installation of a floating dock system and related infrastructure at the Lower Bridge site in Crawfordville, Florida. The work includes site preparation, erosion control, concrete landing construction, and the installation of a floating dock, aluminum gangway, and fixed dock extension. The contractor must be licensed in Florida, possess marine‑construction capabilities, and provide the required insurance coverage. The performance period is short, with a total of 60 days to achieve final completion.
• 8 ft × 30 ft floating dock and aluminum gangway installation
• Concrete landing, site prep, clearing & grubbing, erosion control
• Must deliver within a 60‑day window and maintain extensive liability insurance