Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Civil Engineering
  5. ›Quintette Rd Extension West - Phase 2 PD&E

Escambia County·Florida

Quintette Rd Extension West - Phase 2 PD&E

Closes 1/8/2026$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The purpose of this Request for Qualifications (RFQ) is to engage a Florida Department of Transportation (FDOT) pre-qualified consulting engineering firm to provide professional Project Development & Environment (PD&E) services for the extension of Quintette Road West - Phase 2. The project aims to evaluate and develop a comprehensive plan for expanding and improving West Quintette Road to meet current and future transportation needs in Escambia County. The scope of work includes conducting thorough environmental assessments, engineering analyses, and community engagement to produce detailed conceptual plans and environmental documentation necessary for securing federal and state funding. • The extension will feature a new rural roadway with 12-foot travel lanes, 5-foot paved shoulders, stormwater conveyance, a 10-foot multiuse path, and a crossing at Jacks Branch. • The project seeks to enhance roadway capacity, safety, and multimodal access by identifying optimal design solutions that balance environmental, social, and technical considerations. • The CONSULTANT shall adhere to the guidance established in the Florida Department of Transportation’s (FDOT) current PD&E Manual, Design Manual, and the applicable Context Classification, along with other pertinent manuals and standards. • The CONSULTANT shall conduct thorough environmental assessments, including wetlands, threatened and endangered species, floodplains, water quality, cultural resources, and natural habitats, and develop appropriate mitigation strategies when impacts are unavoidable.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tammy Straughn(Purchasing Coordinator)

[email protected]

(850) 595-4985

Key dates

Opened
12/5/2025
Questions due
12/19/2025
Pre-bid meeting
12/11/2025
Closes
1/8/2026
Duration
36 months

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
541330
Solicitation №
PD 25-26.026

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the requirements for the consulting engineering firm. The project involves providing PD&E services for the extension of Quintette Road West - Phase 2, which includes conducting environmental assessments, engineering analyses, and community engagement. The estimated budget for this project is between $500,000 and $2,000,000, considering the complexity of the project, the requirements for the consulting engineering firm, and the typical costs associated with similar projects. The factors that may influence the likely payment range include the experience and qualifications of the consulting engineering firm, the complexity of the project, and the requirements for the scope of work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Sacramento·California

Top match · 61%

Envision Triangle Space

Closes 11/4/2026Opened 10/19/2026

State of Delaware DOT·Delaware

61% match

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Town of Upton·Wyoming

61% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

Cobb County·Georgia

61% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

U.S. Department Of Transportation·Wyoming

60% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Calhoun County Board of County Commissioners·Florida

60% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

City of Charlotte·North Carolina

60% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Lakesong Municipal Management District No. 1 of Ellis County·Texas

60% match

Lakesong Boulevard, Phase 2 Landscape Public Bid

Closes 11/4/2026Opened 10/19/2026

U.S. Department Of Defense·Missouri

59% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

County of San Luis Obispo·California

59% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Coronado·California

59% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Tontitown·Arkansas

59% match

Fletcher Avenue Extension – West

Closes 12/1/2026Opened 10/25/2026

City of Lowell·Massachusetts

59% match

Saint Louis Park Phase 2, addenda 3 issued

Closes 11/4/2026Opened 10/7/2026

Los Angeles County Public Works·California

59% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

NYS East Fishkill, Town of·New York

59% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Town of Medfield·Massachusetts

59% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

U.S. Department Of Defense·Utah

59% match

Hill AFB Actuator Phase 2A

Closes 12/22/2026Opened 10/27/2026

U.S. Department Of Defense·Nebraska

59% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

County of Los Angeles Department of Public Works·California

59% match

TDS0001709 - San Gabriel Valley Traffic Signal Safety Project Group II

Closes 11/24/2026Opened 10/20/2026

Massachusetts Division of Capital Asset Management and Maintenance (DCAMM)·Massachusetts

59% match

SDE1902 Phase 2 Trade RFB

Closes 11/9/2026Opened 10/6/2026

City of San Diego·California

58% match

Gompers Prep 47th St Safety Enhancement

Closes 11/19/2026Opened 10/20/2026