The project involves the installation of submersible water well pumps at the Ushi and M-10 wells, Tinian North Field, CNMI. The purpose is to establish a reliable and sustainable water supply for non-potable applications. The contractor will be responsible for selecting a new, BAA-compliant pump system that meets all performance requirements outlined in the PWS.
• The target flow rate is approximately 50,000 GPD, which equates to a design flow rate of approximately 35 Gallons Per Minute (GPM).
• The Government will provide a 460V/3-Phase power source at a connection point located within 100 feet of each wellhead.
• The Contractor is responsible for all subsequent work, including trenching, conduit, wiring, and final connections from that point to their supplied equipment.