The City of Omaha is soliciting bids for the complete renovation of the Pheasant Run Park playground. The scope includes demolition of existing surfacing, concrete removal and replacement, grading and drainage improvements, installation of new resilient surfacing, construction of concrete curbs, benches, in‑line drains, and all associated site work. The contractor must provide all labor, materials, equipment, and permits required to bring the playground to the design specifications, including compliance with municipal bid‑bond requirements. Bids must be submitted electronically with the required bid bond or acceptable substitute, and all questions must be submitted by the cut‑off date.
• Location: 15504 Adams St., Omaha, NE 68137
• Pre‑bid meeting (non‑mandatory) on 9/23/2026 at the site
• Bid bond must be issued by a Nebraska‑licensed surety or acceptable cash substitute
• Close date: 10/7/2026, 11:00 AM CT
• Primary contact: Tamara Hibbert, Purchasing Department
• Required deliverables: demolition, concrete work, drainage, new playground equipment footing, resilient surfacing, benches, signage, and final inspection compliance.