The project involves upgrading cell locks control at the Carson City Correctional Facility. The work includes replacing existing door controllers, motors, switches, hangers, tracks, lock rails, guides, receiving rails, and doors. The project also involves installing new door controllers, motors, switches, hangers, tracks, lock rails, guides, receiving rails, and doors. The contractor will need to construct a temporary wall to separate the door pair from the remaining occupied wing. The project requires the contractor to have experience with similar projects and to provide a detailed schedule for the work.
Some key features of the project include:
• Replacing existing door hardware with new electro-mechanical locks
• Installing new hollow metal doors and frames
• Painting new doors and frames to match existing doors and frames
• Installing new door position switches and reconnecting existing control cabling
• Constructing a temporary wall to separate the door pair from the remaining occupied wing
• Demolishing existing door controllers, motors, switches, hangers, tracks, lock rails, guides, receiving rails, and doors
• Installing new door controllers, motors, switches, hangers, tracks, lock rails, guides, receiving rails, and doors
• Cleaning and clearing the construct space of tools, materials, etc.
• Removing temporary walls and repeating the sequence until all doors are complete.