Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Washington guideWashington Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Washington
  4. ›Manufacturing
  5. ›Fabrication of aluminum weir panels at Columbia River Rd…

Confederated Tribes of the Colville Reservation·Washington

Fabrication of aluminum weir panels at Columbia River Rd. and Omak Creek, Omak WA

Closes 1/19/2026$50k – $200kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Confederated Tribes of the Colville Reservation is seeking a contractor to fabricate and construct five aluminum fish weir frames and 15 insert panels. The frames will be 10' long x 5' wide and made of 2" square aluminum tubing with cross framing every 36" to support insert panels. The insert panels will be made of "T" shaped aluminum pickets spaced 1.5" apart and will be capable of being removed during high flows to maintain debris and optimal water levels within the creek. • The contractor must provide a detailed cost proposal, including proposed hourly rates for all persons employed by or contracting with the contractor to provide the work described. • The contractor must have experience in developing fair market values, particularly emphasizing its experience in working on these matters with Indian tribes and within Indian Country. • The contractor must provide a statement regarding any potential conflict of interest issues the contractor might have or encounter in providing these services to the Colville Tribes. • The contractor must provide a certification regarding debarment, suspension, proposed debarment, and other responsibility matters.

Attached files

Contact

Wesley Tibbits(Procurement Contact)

[email protected]

(509) 634-2277

Key dates

Opened
1/5/2026
Questions due
1/12/2026
Closes
1/19/2026
Duration
3 years

Last updated

Details

Type
Request for Proposal
Industry
Manufacturing
NAICS
332
Solicitation №
RFP | Fish & Wildlife, Fabrication of aluminum weir panels at Columbia River Rd. and Omak Creek, Omak WA

Budget estimate

$50,000 – $200,000

The budget for this project can be estimated based on the materials and labor required to fabricate and construct the aluminum fish weir frames and insert panels. The cost of materials, including aluminum tubing and pickets, will depend on the quantities required and the supplier. The cost of labor will depend on the number of workers required and their hourly rates. Based on these factors, a rough estimate for the project could be between $50,000 and $200,000. The lower end of the estimate, $50,000, could be based on a simple design and minimal labor requirements, while the higher end of the estimate, $200,000, could be based on a more complex design and higher labor requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Washington

Top match · 67%

Sources Sought: Albeni Falls Dam Spillway Gate Replacments

Closes 4/29/2028Opened 4/17/2025

Confederated Tribes of the Colville Reservation·Washington

66% match

Traditional Territories Program, Concrete Slab Construction – Omak Fish and Wildlife Bullpen (Saint Mary’s Mission Campus)

Closes 11/26/2026Opened 10/23/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Defense·Illinois

65% match

Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication

Closes 11/30/2026Opened 10/15/2026

Alaska Native Tribal Health Consortium (ANTHC)·Alaska

65% match

Selected Construction Opportunities

Closes 1/1/2036Opened 12/7/2023

U.S. Department Of Defense·Michigan

65% match

Sebewaing River South Levee Repairs

Closes 1/23/2027Opened 11/17/2025

U.S. Department Of Defense·Louisiana

65% match

Flood Control, Amite River Tributaries, Louisiana, Comite River Basin, Comite River Diversion Project, Bayou Baton Rouge Rock Chute, East Baton Rouge Parish, Louisiana

Closes 2/6/2027Opened 11/5/2024

U.S. Department Of Defense·Louisiana

65% match

Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011)

Closes 5/7/2028Opened 4/15/2026

Snohomish County·Washington

65% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

Washington Parks & Recreation Commission, State·Washington

65% match

SW Region Cross Bracing Fabrication

Closes 12/15/2026Opened 10/29/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Lower Platte North Natural Resources District·Nebraska

64% match

LOWER PLATTE NORTH NATURAL RESOURCES DISTRICT WAHOO CREEK WATERSHED SITE 77

Closes 12/2/2026Opened 9/18/2026

City of Hutchinson·Minnesota

64% match

Hutchinson, City of South Fork Crow River Sediment Forebay BMI No. 0W1.123849

Closes 12/1/2026Opened 10/29/2026

East Bay Municipal Utility District·California

64% match

Mokelumne River Floodplain Habitat Restoration Project

Closes 11/6/2026Opened 9/21/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Municipality of Skagway·Alaska

64% match

West Creek Levee Improvements

Closes 11/9/2026Opened 10/12/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Defense·Louisiana

64% match

ATCHAFALAYA RIVER BAY, BAR, AND CREWBOAT CUT CUTTERHEAD DREDGE NOS. 3-2026, OM26061

Closes 6/12/2028Opened 6/14/2026

U.S. Department Of Defense·Missouri

64% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Oregon Clackamas County·Oregon

64% match

RFP 2026-80 Sandy River Force Main River Crossing Project â?? Progressive Design-Build

Closes 12/3/2026Opened 10/29/2026

Wyoming Department of Transportation·Wyoming

64% match

EXTRUDED ALUMINUM SIGN PANELS

Closes 11/3/2026Opened 10/9/2026

Oregon Urban Flood Safety & Water District·Oregon

64% match

Water Resources Engineering On-Call Services

Closes 12/3/2026Opened 10/19/2026

City of Cedar Rapids·Iowa

64% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026