Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›Nolan Rd Phase 2

St. Tammany Parish Government·Louisiana

Nolan Rd Phase 2

Closes 9/22/2026$3M – $10MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation covers the construction of Nolan Road Phase 2 in Covington, LA, involving comprehensive roadway upgrades and drainage improvements. The work includes subsurface drainage installation, widening, asphalt overlay, clearing and grubbing, driveway and signage replacement, and hydro‑seeding. The contract is awarded to the lowest responsible bidder and must be completed within a 120‑day period, with a 5 % bid bond and a full‑value performance bond required. • Subsurface drainage on both sides of the road, plus removal of structures/obstructions. • Roadway widening, 2‑inch asphalt overlay, pavement patching, and striping. • Clearing & grubbing, driveway replacement, signage replacement, hydro‑seeding, and temporary signs/barricades. • Contractor must provide a 5 % bid guarantee, 100 % performance bond, and meet extensive insurance and licensing requirements.

Attached files

Contact

[email protected]

(985) 898-2520

Key dates

Opened
8/26/2026
Questions due
9/11/2026
Closes
9/22/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
236220
Solicitation №
26-40-2

Budget estimate

$3,000,000 – $10,000,000

The bid package does not disclose an overall contract amount, but based on typical highway reconstruction projects of comparable length (several miles) and the extensive scope—drainage, widening, asphalt overlay, and ancillary works—a realistic contract value in this region would likely fall between $3 million and $10 million. Factors influencing the range include length of roadway, volume of asphalt (≈ 400 tons), number of drainage structures, and local labor/material rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

State of Delaware DOT·Delaware

Top match · 63%

ADAMS STREET PATHWAY PHASE II

Closes 11/17/2026Opened 10/19/2026

Lakesong Municipal Management District No. 1 of Ellis County·Texas

63% match

Lakesong Boulevard, Phase 2 Landscape Public Bid

Closes 11/4/2026Opened 10/19/2026

Town of Medfield, Massachusetts·Massachusetts

62% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

City of Mason·Ohio

62% match

Snider Road Widening Project - Phase 2

Closes 11/17/2026Opened 10/19/2026

Calhoun County Board of County Commissioners·Florida

61% match

Neal Landing Parking Improvements Phase II

Closes 11/10/2026Opened 10/21/2026

Texas City of San Antonio·Texas

61% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of San Antonio·Texas

61% match

23-03921A Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Rd) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Santa Clara Valley Water District·California

61% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

City of Charlotte·North Carolina

61% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

City of Keene·New Hampshire

61% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Keene·New Hampshire

60% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

County of Okaloosa·Florida

60% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

Town of Eatonville·Florida

60% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Austin·Texas

60% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

Town of Medfield·Massachusetts

60% match

MSH Roadway & Infrastructure Improvements (Phase 2)

Closes 11/19/2026Opened 10/28/2026

City of Austin·Texas

60% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

U.S. Department Of Defense·Missouri

60% match

Belle Fountain Ditch Cleanout Phase 2

Closes 11/3/2026Opened 10/13/2026

City of San Antonio·Texas

60% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

City of Charlotte·North Carolina

59% match

Bryant Farms Phase 2 (Progressive Design-Build)

Rolling / TBD closeOpened 1/1/2026

LA Public Works Engineering Bureau·California

59% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Los Angeles County Public Works·California

59% match

RMD1402001 Hacienda Heights - Hacienda Boulevard Phase 1

Closes 11/17/2026Opened 10/20/2026

City of San Antonio·Texas

59% match

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

Tarrant Regional Water District·Texas

59% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

U.S. Department Of Defense·South Dakota

59% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

City of Gainesville - Procurement Division·Florida

59% match

Sweetwater Recreational Trail Phase 2 (Sweetwater Wetlands Park to Sweetwater Preserve)

Closes 11/12/2026Opened 10/14/2026