The Town of Preston is soliciting sealed bids for a turnkey design‑build project to upgrade its community park. The scope includes engineering and permitting, construction of a 44‑ft × 22‑ft open‑sided timber bandstand, three post‑tensioned concrete pickleball courts with acrylic surfacing and equipment, perimeter fencing, acoustic barriers, and installation of a DECD project identification sign. The contractor must deliver a complete, ready‑to‑use facility, providing all labor, materials, utilities, testing, commissioning, warranties, and close‑out documentation. Bids are due by 10:00 am on October 21, 2026, with a mandatory site walk on October 7, 2026.
• Turnkey design‑build (design, permits, construction, commissioning)
• Timber bandstand (~44 × 22 ft) and three pickleball courts with acrylic surface
• Required fencing, acoustic barriers, signage, and related site work
• All licensing, engineering, and code compliance handled by the contractor
• Sealed bids due 10 am Oct 21 2026; mandatory site walk Oct 7 2026 at 9 am.