Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Pageland Electrical Expansion

Northeastern Technical College·South Carolina

Pageland Electrical Expansion

Closes 6/25/2026$2k – $5kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Northeastern Technical College is expanding its welding training facility in Pageland, SC. The project involves installing new electrical infrastructure to support additional training booths, including bus drop cables, circuit breakers, receptacles, and associated hardware. This work will enhance the capacity of the existing welding program and requires a qualified electrical contractor to execute the installation per specifications. • Install six 65‑foot, 8‑gauge bus drop cables with 50 A twist‑locking connectors. • Provide and install six General Electric AC362R bus plugs. • Install four 20 A single‑circuit, weather‑proof receptacles located about 100 ft from the panel. • Supply and fit four Square D bolt‑in breakers to the existing panel. • Coordinate with college staff to ensure minimal disruption to ongoing training activities.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lorne Brooks(Agency Project Coordinator)

[email protected]

(843) 921-6905

Key dates

Opened
6/17/2026
Closes
6/25/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
238210
Solicitation №
NETC-26-0010

Budget estimate

$2,000 – $5,000

Based on typical costs for small‑scale electrical upgrades (materials + labor), a 6‑drop bus system with breakers and weather‑proof receptacles in a college setting usually ranges from $2,000 to $5,000. Labor rates in South Carolina (~$80‑$120 per hour) and material costs for 8‑gauge cable, connectors, and breakers drive the estimate. The low end assumes minimal labor time and bulk‑purchased materials; the high end accounts for higher labor rates, potential site‑specific challenges, and premium brand components.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Massachusetts Convention Center Authority·Massachusetts

Top match · 62%

V04 - Lawn on D Utilities Upgrades

Closes 11/12/2026Opened 10/14/2026

NYS Rochester-Genesee Reg. Transportation Authority·New York

61% match

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

City of Duluth·Minnesota

59% match

Bayview, Orphanage and Proctor Booster Station Power System Upgrades

Closes 11/24/2026Opened 10/23/2026

Power Authority of New York·New York

59% match

LAN CONNECTIVITY EXPANSION

Closes 11/9/2026Opened 10/19/2026

NYS OGS Design & Construction - Construction Contractors·New York

59% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

City of Gallup·New Mexico

59% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

Massachusetts Town of Amherst·Massachusetts

58% match

27-016 Munson Library Electrical System Upgrade

Closes 11/12/2026Opened 10/28/2026

NYS Brookhaven, Town of·New York

58% match

Installation of Generators at Various Town Locations

Closes 11/13/2026Opened 10/26/2026

Palm Beach County Water Utilities Department·Florida

58% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 10/16/2026

Village of Key Biscayne·Florida

57% match

Continuing Electrical Maintenance, Repair, Installation, and Emergency Services

Closes 11/12/2026Opened 10/6/2026

Maryland Saint Mary's County Metropolitan Commission·Maryland

57% match

Electrical Services

Closes 11/10/2026Opened 10/15/2026

Lee County·Florida

57% match

Veterans Parks - Electrical Site Lighting

Closes 11/3/2026Opened 10/2/2026

NYSERDA·New York

57% match

Grid Modernization Grid Enhancing Technologies

Closes 11/19/2029Opened 6/26/2026

Palm Beach County Water Utilities Department·Florida

57% match

WRWWTF Electrical Building Progressive Design-Build

Closes 11/12/2026Opened 9/23/2026

Port of Fernandina·Florida

57% match

RFP Lighting Improvement

Closes 11/4/2026Opened 10/5/2026

Iowa State University·Iowa

56% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

City of Carrollton·Texas

56% match

Electrical Services

Closes 11/3/2026Opened 10/16/2026

City of Watsonville·California

56% match

River Park Electrical Relocation

Closes 11/5/2026Opened 10/5/2026

SC Department of Education·South Carolina

56% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

City of Carrollton·Texas

56% match

Electrical Services

Closes 11/3/2026Opened 10/16/2026

Maryland Wicomico County Government·Maryland

56% match

Fruitland Sewer Extension Preliminary Engineering Report

Closes 12/2/2026Opened 10/15/2026

U.S. Department Of Defense·Ohio

56% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

New Orleans Regional Transit Authority·Louisiana

56% match

Installation of Transfer Switches & Emergency Generator

Closes 11/11/2026Opened 9/14/2026

U.S. Department Of Defense·Ohio

56% match

Repair Electrical Systems

Closes 11/12/2026Opened 4/20/2026

City of Freeport·New York

56% match

FREEPORT POLICE DEPARTMENT EXTENSION ELECTRICAL CONSTRUCTION REBID 2

Closes 11/6/2026Opened 10/26/2026