Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›US 17-92 Overpass Pedestrian Improvements FPID #…

Seminole County·Florida

US 17-92 Overpass Pedestrian Improvements FPID #: 441484-1-58-01

Closes 5/20/2026$1.5M – $3MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Seminole County Board of County Commissioners is seeking a qualified contractor to construct 0.217 miles of recreational path that will allow connectivity and provide access from the US 17/92 adjacent sidewalks to the Cross Seminole Trail. The scope of work includes a retaining wall system, drainage improvements, concrete sidewalk, signage and pavement marking, clearing and grubbing, excavation, embankment, and the maintenance of traffic. The contractor must be Florida Department of Transportation (FDOT) Prequalified in working classes: 7. Drainage and 11. Grading. Prime Contractor or Utilized Subcontractor shall be FDOT Prequalified in the following work class: 40. Retaining wall. The project must be substantially complete within 193 calendar days from the issued Notice to Proceed (NTP) and must reach final completion 30 calendar days after substantial completion. • The project requires a minimum of 40% of the total work to be performed by the contractor within their own organization. • The contractor must comply with FDOT prequalifications and requirements. • The contractor must provide insurance coverage as specified in the contract documents. • The project includes a liquidated damages clause based on the executed contract value and the current FDOT liquidated damages schedule. • The contractor must suspend operations during holidays and special events, unless written approval is obtained from the engineer.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Guild(Senior Procurement Analyst)

[email protected]

(407) 665-7122

Key dates

Opened
4/15/2026
Questions due
5/10/2026
Pre-bid meeting
4/24/2026
Closes
5/20/2026
Duration
223 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
CC-6545-25/MAG

Budget estimate

$1,500,000 – $3,000,000

The estimated budget for this project is between $1,500,000 and $3,000,000. The engineer's estimate for the project is $2,161,935.04, which suggests that the actual budget could be around this amount. However, the final budget will depend on the bids received and the contractor selected for the project. Factors that may influence the budget include the complexity of the project, the materials and labor required, and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Division of Highways·North Carolina

Top match · 71%

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

City of Richmond Government·Virginia

71% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Minnesota Department of Transportation·Minnesota

70% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Seattle·Washington

70% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Virginia Department of Transportation·Virginia

69% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Town of Westwood·Massachusetts

68% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

NYS East Fishkill, Town of·New York

68% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Delaware River Joint Toll Bridge Commission·New Jersey

68% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

Massachusetts Department of Transportation·Massachusetts

68% match

616276 FOXBOROUGH-MIDDLEBOROUGH-NORTON FAP No. STP(BR-OFF)-004S(017)X Bridge Preservation along I-

Closes 11/3/2026Opened 9/21/2026

City of Richmond Government·Virginia

67% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Illinois Tollway·Illinois

67% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

67% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Idaho Transportation Department·Idaho

66% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Sacramento·California

66% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of Richmond·Virginia

66% match

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/2/2026Opened 10/23/2026

LA Public Works Engineering Bureau·California

66% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

City of Ontario·California

66% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Vernon·California

66% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

New York City Department of Transportation·New York

66% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

BREC·Louisiana

66% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

City of Salina·Kansas

66% match

Addendum%20%233%20North%20Ohio%20Overpass%20Painting

Rolling / TBD closeOpened 10/19/2026

Maryland State Highway Administration·Maryland

66% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Moline·Illinois

66% match

Ave. of the Cities & 53rd St. Intersection Project

Closes 11/10/2026Opened 10/25/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

65% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

Maryland State Highway Administration·Maryland

65% match

AA9205179 - MD 3 BU (New Cut Road / Crain Highway) from MD 997 E (Stevenson Road) to Oak Manor Drive Pedestrian Safety Action Plan Project

Closes 11/5/2026Opened 9/29/2026