The project involves the final plan for Hopewell Road, specifically the STP-9901 (674) section. The scope of work includes lighting, signing, and striping, as well as traffic control and drainage improvements. The project requires the installation of 30-foot lighting poles, LED luminaires, and control stations. The contractor will also be responsible for trenching, conduit installation, and cable pulling. The project is located in St. Charles County, Missouri, and the bid deadline is April 17, 2026.
• The project includes the installation of 10 lighting poles, 10 brackets, and 10 LED luminaires.
• The contractor will be responsible for trenching and conduit installation for the lighting and control systems.
• The project requires the installation of control stations, pull boxes, and cable.
• The contractor must ensure that all work is completed in accordance with the plans and specifications.
• The project includes traffic control and drainage improvements.
Attached files
Similar opportunities
Matched by Bid Banana AI™
Bid Banana · 1.6M+ bids and awards 🍌
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.