Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Water and Wastewater
  5. ›Katherine Plant Sewer Realignment

Chester Sewer District·South Carolina

Katherine Plant Sewer Realignment

Closes 9/21/2026$150k – $250kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation seeks a contractor to construct a gravity sanitary sewer realignment at the Katherine Plant in Chester, SC. The work includes installing approximately 138 linear feet of 8‑inch SDR‑35 PVC pipe, performing manhole tie‑ins (rebuilding bench and invert, core/boot connections), abandoning the existing line with non‑shrink grout, providing sewer bypass/flow control during tie‑ins, implementing erosion and sediment control measures, and completing all required testing. The project follows a Design‑Bid‑Build delivery method and requires coordination with the Chester Sewer District. • Install 138 ft of 8‑in. PVC gravity sewer main between two existing manholes. • Perform manhole tie‑ins, rebuild benches, and provide core/boot connections. • Abandon existing sewer line, manage flow control, and conduct erosion/sediment control and testing.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Duane Wingo(Agency Project Coordinator)

[email protected]

(803) 377-3541

Key dates

Opened
9/8/2026
Closes
9/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
CWR IFB 2026-08

Budget estimate

$150,000 – $250,000

Based on regional cost data for similar sewer pipe installations, 138 ft of 8‑in. PVC pipe, manhole tie‑ins, abandonment, bypass flow control, and required testing typically range from $150,000 to $250,000. This estimate assumes standard material costs, labor rates in South Carolina, and modest site‑specific conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Hastings Utilities·Nebraska

Top match · 66%

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Thomas·Oklahoma

65% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

Town of Andrews·South Carolina

63% match

Cherry Street Sewer Upgrade

Closes 11/13/2026Opened 10/14/2026

City of Douglas·Wyoming

63% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Georgia City of Lagrange·Georgia

63% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

City of Key West·Florida

62% match

CDBG-MIT – Trenchless Installation of Utilities Across Fleming Channel

Closes 12/2/2026Opened 10/15/2026

Alaska Department of Environmental Conservation – Village Safe Water Program·Alaska

62% match

Notice of Categorical Exclusion Determination - Marshall Phase 9 Water and Sewer Improvements

Rolling / TBD closeOpened 9/25/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

61% match

Full Document: Request for Proposals. Sewer Utility Superintendent & Engineering Consultant 2026-2027

Closes 11/13/2026Opened 10/29/2026

Dickenson County·Virginia

61% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

U.S. Department Of Defense·Kansas

61% match

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Closes 11/13/2026Opened 10/13/2026

Brazos Valley·Texas

61% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Maryland Baltimore County Government·Maryland

61% match

20127 SX0 Jennifer Branch Relief Sewer Consent Decree

Closes 11/5/2026Opened 9/26/2026

Katy Springs LLC for the Benefit of Harris County Municipal Utility District No. 495·Texas

61% match

Detention Pond and Offsite Storm Sewer to serve Katy Springs

Closes 11/12/2026Opened 10/13/2026

City of Lynchburg·Virginia

61% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Housing Authority of Lafourche Parish·Louisiana

61% match

Replacement of Sewer Treatment Plant, Orange Grove Site LA-80-7 (C)

Closes 11/12/2026Opened 10/16/2026

City of Opa-locka·Florida

61% match

Sewer Infrastructure Improvement Project: Lift Station No. 4 to York Street Lot 25

Closes 11/13/2026Opened 10/14/2026

City of Rapid City·South Dakota

61% match

Lacrosse Street Sanitary Sewer Reconstruction

Closes 11/17/2026Opened 10/29/2026

Brazos Valley·Texas

61% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

County of York·Virginia

61% match

#B128260-GW Route 17 Sewer Extension

Closes 12/3/2026Opened 10/30/2026

City of South San Francisco·California

61% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026

Baltimore County, Maryland·Maryland

60% match

CHEMICAL ROOT CONTROL, SEWER TREATMENTS, TERM CONTRACT

Closes 11/17/2026Opened 10/8/2026

Orange County Sanitation District, CA·California

60% match

3-60 (Construction), Knott-Miller Holder Artesia Branch Rehabilitation

Closes 11/16/2026Opened 9/29/2026

City of Pearland·Texas

60% match

Scarsdale Boulevard Sewer Extension

Closes 11/4/2026Opened 10/14/2026

City of Charlotte·North Carolina

60% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

City of Charlotte·North Carolina

60% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026