The City of Newport Beach is procuring and installing two permanent standby generators—one at the Utility Yard and one at the Corporation Yard—replacing existing trailer‑mounted units. The contract includes all associated civil, electrical, and control work: concrete pads, underground conduit, grounding systems, surge protective devices, SCADA integration, fuel tanks, diesel particulate filters, and required testing and commissioning. The work must be completed within a 50‑working‑day construction window after the Notice to Proceed, with a 140‑day procurement period, and includes strict compliance with California labor‑wage, safety, and environmental regulations.
• Supply, deliver, and install two diesel generator sets (~150 kW and ~200 kW) with ATS, fuel tanks, and DPF systems.
• Perform extensive electrical work: new conduit, grounding, panelboards, surge protection, and SCADA networking.
• Provide all civil construction (concrete pads, trenching, utility relocations) and obtain required permits, inspections, and BMP compliance.