The budget for this project can be estimated based on the scope of work and the prevailing wage rates. The project includes the construction of a 9,136 square foot administration building, a 7,130 square foot fleet maintenance building, and the development of approximately 131,000 square feet of site. The prevailing wage rates for the area are provided in the contract documents. Assuming an average cost per square foot of $200 for the administration building and fleet maintenance building, and an average cost per square foot of $50 for the site development, the total cost of the project could be estimated as follows: Administration building: 9,136 square feet x $200 per square foot = $1,827,200 Fleet maintenance building: 7,130 square feet x $200 per square foot = $1,426,000 Site development: 131,000 square feet x $50 per square foot = $6,550,000 Total estimated cost: $1,827,200 + $1,426,000 + $6,550,000 = $9,803,200 Based on this estimate, the budget for the project could be in the range of $9 million to $12 million, depending on the actual costs and the prevailing wage rates.