The City of Hastings is soliciting a fixed‑price, lump‑sum bid for the design‑build electrical scope of the Bottom‑Ash Water Recirculation System at the Whelan Energy Center, Unit 1. The contractor will supply, install, and commission a new motor‑control center (MCC 1H), run 480 V power and control wiring, install conduit, raceways, cable trays, grounding, and instrumentation tubing, label everything, and provide start‑up support through the plant outage window. The work must be completed within a tight construction window (approximately late March to mid‑April) with substantial completion required by May 1 2026, and the contract carries a $500/day liquidated‑damage penalty for overruns.
• Install City‑supplied MCC 1H and associated Allen‑Bradley I/O modules in existing control cabinets.
• Provide all power, control, instrumentation cabling, conduit, raceway, grounding, and labeling per NEC and project drawings.
• Perform testing, functional checkout, and start‑up support during the plant outage, then turn over as‑built documentation and a 12‑month warranty.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.