Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Construction
  5. ›JCAC New Century AirCenter (IXD) Construct Airfield…

Johnson County·Kansas

JCAC New Century AirCenter (IXD) Construct Airfield Electrical Vault Project

Closes 5/12/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Johnson County Airport Commission is seeking bids for the construction of a new airfield electrical vault at the New Century AirCenter (IXD) airport. The project includes the removal of the existing electrical vault, installation of a new prefabricated vault, upgraded home-run wiring, addition of a dedicated backup power source, and system elevation to meet current Part 139 electrical standards. The contractor will be responsible for completing the work within 82 calendar days. Key aspects of the project include: • Removal and disposal of the existing electrical vault • Installation of a new prefabricated vault and associated electrical components • Upgraded home-run wiring to the vault and control tower • Addition of a dedicated backup power source • System elevation to meet current Part 139 electrical standards • Maintenance of airfield lighting and navigation systems during construction The contractor must comply with all applicable laws, regulations, and airport rules, and ensure that the work is completed in a safe and efficient manner.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Megan Wasek(Procurement Contact)

[email protected]

(913) 715-0591

Key dates

Opened
4/14/2026
Questions due
5/1/2026
Pre-bid meeting
4/23/2026
Site visit
4/23/2026
Closes
5/12/2026
Duration
82 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
2026-020 Addendum 2

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and industry standards. The construction of a new airfield electrical vault, including the removal of the existing vault, installation of a new prefabricated vault, and associated electrical components, is a significant project that requires specialized labor and materials. Assuming an average cost per day for a project of this nature, and considering the 82-day project duration, a rough estimate for the total project cost could be in the range of $500,000 to $2,000,000. Factors that may influence the budget include the complexity of the electrical work, the need for specialized equipment and labor, and the requirements for maintaining airfield lighting and navigation systems during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 72%

Center Lighting Vault Relocation

Rolling / TBD closeOpened 3/15/2027

Delta Airport Consultants·Virginia

70% match

Quinton, VA - New Kent County Airport - Construct T-Hangars and Site (24052)

Rolling / TBD closeOpened 10/22/2026

Cincinnati/Northern Kentucky International Airport·Kentucky

69% match

Vault 12 and South ARFF Generator Upgrades

Closes 11/5/2026Opened 10/1/2026

U.S. Department Of Defense·Maine

68% match

Maine Air National Guard Fuel Cell Hangar (FCH), Project No. FKNN159044

Closes 12/1/2026Opened 9/21/2026

Franklin County Board of County Commissioners·Florida

68% match

ITB- AIRPORT WEST HANGER DEVELOPMENT

Closes 12/14/2026Opened 10/28/2026

U.S. Department Of Defense·Ohio

68% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Defense·Ohio

68% match

Repair Electrical Systems

Closes 11/12/2026Opened 4/20/2026

U.S. Department Of Defense·United States of America

68% match

Air National Guard (ANG) Fiscal Year 2027 Planned Design and Construction Projects

Closes 9/30/2027Opened 9/24/2026

City of Charlotte·North Carolina

68% match

Airport Surveillance Radar Relocation Construction

Rolling / TBD closeOpened 5/3/2027

U.S. Department Of Defense·Kentucky

67% match

WPAFB 3rd Air Stream/ B18

Closes 10/31/2026Opened 10/17/2025

Greater Orlando Aviation Authority·Florida

67% match

Construction Manager at Risk (CMAR) Entity for the Airside 2 Wing Expansion Program (BP-00517)

Closes 11/9/2026Opened 9/28/2026

County of Sacramento·California

67% match

Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project

Closes 12/1/2026Opened 9/10/2026

City of Prescott·Arizona

67% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

Delta Airport Consultants·Virginia

67% match

COMING SOON - Quinton, VA - New Kent County Airport - Construct T-Hangars (Site Prep) 24052

Rolling / TBD closeOpened 3/1/2026

U.S. Department Of Defense·South Carolina

67% match

JB Charleston Multiple Award Construction Contract

Closes 11/2/2026Opened 10/9/2026

Massachusetts Port Authority (Massport)·Massachusetts

67% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

State of Michigan Department of Transportation·Michigan

66% match

591/26063.KMM; Aeronautics - HVAC Equipment Placement

Closes 11/11/2026Opened 10/23/2026

Delta Airport Consultants·Virginia

66% match

Farmville, VA - Farmville Regional Airport - Replace RW 3-21 PAPI'S (24062)

Rolling / TBD closeOpened 10/22/2026

U.S. Department Of Defense·North Dakota

66% match

CRAC Units Replacement for MCE 1211 at GFAFB, ND

Closes 11/24/2026Opened 10/29/2026

Jacksonville Aviation Authority·Florida

66% match

JAA JAX Concourse B Apron Phase 2

Closes 11/17/2026Opened 10/15/2026

Houston Airport System·Texas

66% match

IAH Terminal D HVAC Efficiency Upgrades

Closes 11/12/2026Opened 9/11/2026

City of Charlotte·North Carolina

66% match

PCC Slab Replacement Program

Rolling / TBD closeOpened 8/3/2026

U.S. Department Of Defense·Ohio

66% match

Government Requirement for Advanced Power and Energy (GRAPE)

Closes 12/31/2027Opened 8/25/2025

Franklin County Courthouse Annex·Florida

66% match

ITB-West Hangar Development Project

Closes 12/16/2026Opened 10/29/2026

U.S. Department Of Defense·Massachusetts

66% match

Hanscom Aero Club Automated Fuel Management System Replacement

Closes 11/6/2026Opened 10/16/2026